Art Deco and Inter-War Apartment Blocks: Remedial Repairs

4 November 2026 · 4 min read · By the METCON team

Inter-war apartment blocks, built between the wars, are a defining feature of suburbs like Elizabeth Bay, Potts Point, Bondi, Coogee, Randwick, Kirribilli and Neutral Bay. Many are Art Deco, with feature brickwork, curved balconies and steel windows. They are now around 90 to 100 years old and often strata titled.

Common problems

Balconies

Early concrete balconies often have thin cover over the steel and no proper waterproofing. Concrete cancer and leaks are common. See signs of balcony failure.

Steel framed windows

Original steel windows rust, crack the surrounding brickwork as they expand, and leak. They can often be repaired or restored rather than replaced.

Brickwork and mortar

Face brick and decorative patterns need matching bricks and mortar. Rusted steel built into walls causes cracking. See lime and cement mortar.

Concrete elements

Awnings, hoods, parapets and stairs made of early concrete suffer from carbonation. See causes of concrete cancer.

Roofs, gutters and parapets

Flat roofs, parapets and hidden gutters leak into top floor units. See apartment roof leaks.

Damp

Ground floor units and basements suffer from rising damp and poor drainage.

Corroded reinforcement in early concrete.
Corroded reinforcement in early concrete.

Heritage controls

Many of these buildings are heritage items or in conservation areas. Visible changes such as new balustrades, window replacements or render over face brick may need approval. See heritage approvals.

Class 2 and the DBP Act

An inter-war apartment block is a Class 2 building, so remedial work on building elements may need regulated designs and a registered builder under the DBP Act.

How the right repairs help

Done well, remedial work keeps these buildings dry, safe and attractive, and protects the value that buyers pay for their character. Done badly, with generic replacements, it can strip that character away.

Inter-war strata remedial work

We repair balconies, brickwork, concrete and waterproofing on inter-war apartment buildings with respect for their heritage. METCON is DBP registered (BUP4254812). Call 0415 840 500 or book a free inspection.

Frequently asked questions

What are the main problems in Art Deco apartment blocks?

Concrete cancer and leaks in early concrete balconies, rusting steel windows, cracked brickwork from embedded steel, roof and parapet leaks and damp.

Can original steel windows be repaired?

Often, yes. Rusted sections can be repaired and the frames restored, which can be preferable to replacement in heritage buildings.

Is an inter-war block covered by the DBP Act?

Yes. Apartment blocks are Class 2 buildings, so remedial work on building elements can fall under the DBP Act.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote