Many older Sydney apartment buildings deal with defects one at a time: a leaking balcony this year, a cracked facade next year, the roof the year after. Each job sets up its own access, its own contract and its own disruption. A whole-of-building remedial program takes a different approach: assess everything, then fix it in one planned project.
Why owners choose a whole-building program
- Access is paid for once. Scaffold or swing stages are often one of the biggest costs. One setup can serve balconies, facade, windows and roof.
- Problems are connected. Facade cracks, balcony leaks and window leaks often share the same water paths.
- Less total disruption. One period of works instead of years of rolling jobs.
- Better long-term value. Fixing causes building-wide stops the cycle of repeat repairs.

The steps
- A building condition assessment or defect report covering every element. See strata building condition reports.
- An engineer's scope and specification, with priorities.
- A budget and funding plan: capital works fund, special levy, strata loan or a mix.
- Owners' approval at a general meeting.
- Tender to suitably licensed and DBP registered builders.
- Staged works, with clear communication to residents.
Staging the work
Large programs are usually staged by elevation, stack of balconies or floor. Each stage finishes completely before the scaffold moves on, so residents get their balconies back progressively.
Prioritise if the budget is tight
If everything cannot be done at once, do safety and structural items first, then water entry, then appearance. Keep the access shared where possible. See prioritising strata repairs.
Whole-building remediation
We deliver staged whole-of-building remedial programs on occupied Class 2 buildings: balconies, facades, roofs, windows and concrete repairs under one contract. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Is a whole-building program always cheaper?
Not always upfront, but sharing access and fixing causes once usually costs less over the building's life than repeated small jobs.
How long does a whole-building program take?
It depends on the size and scope. Mid-sized walk-ups may take a few months; larger buildings longer, in stages.
Can we split it over two financial years?
Yes. Many owners corporations stage the works and the levies, starting with the most urgent items.


