Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Underpinning ยท Sydney Stabilising your foundations.

We assess, engineer, and stabilise foundations for homes and commercial buildings across Sydney. Reactive soils, subsidence, tree root damage, load increases. Engineered solutions, not temporary fixes.

  • Licensed NSW Builder
  • Engineer-Designed Underpinning
  • Mass Concrete Underpinning
  • Screw Pile Systems
  • Resin Injection Specialists
  • Foundation Restumping
Talk directly with the builder0415 840 500

Free underpinning quote

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
When foundations move

The ground shifts. Your building shouldn't.

Sydney's reactive clay soils expand when wet and shrink when dry. Add mature trees drawing moisture, poor drainage, or increased building loads, and foundations start moving. Doors jam, walls crack, floors slope. These aren't cosmetic issues, they're signs your building has lost its base.

METCON carries out underpinning across Sydney, working with structural and geotechnical engineers to assess the cause of movement, design the correct underpinning solution, and execute it to specification. Every underpinning project is engineered, documented, and certified.

Whether it's a single pier under a settling corner or a full perimeter underpin on a heritage terrace, the approach is the same: proper engineering, quality execution, full documentation.

Image placeholder
Underpinning
Is this you?

Six signs your foundations need attention

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Cracks in brickwork wider than 3mm

Stair-step cracking in masonry is the most common visible sign of differential foundation settlement.

Doors and windows that won't close properly

Frame distortion from foundation movement shows up as sticking, jamming, or gaps around openings.

Sloping or uneven floors

A floor that wasn't always on a lean usually means one part of the foundation has dropped.

Gaps between walls and ceiling or floor

Separation at junctions indicates the structure is pulling apart due to differential settlement.

Cracked or heaving concrete slab

Reactive soils pushing up or collapsing under the slab create visible cracking and unevenness.

Visible gaps at the base of external walls

Daylight visible under the bottom course of brickwork means the footing has moved away from the wall.

Spot one of these? Send us a photo, we'll tell you whether it needs monitoring or immediate underpinning.

What we deliver

The right underpinning method for your site.

Every foundation is different. We match the underpinning method to the soil conditions, building type, and engineering requirements.

01

Mass Concrete Underpinning

The traditional method. Sequential excavation beneath existing footings and placement of mass concrete to extend the footing to a stable bearing stratum. Reliable and well-proven.

02

Screw Pile Underpinning

Steel screw piles driven through unstable soil to reach load-bearing ground. Ideal for reactive soils, minimal vibration, and less disruption to the existing structure.

03

Resin Injection Stabilisation

Expanding polyurethane resin injected beneath footings to fill voids, compact soil, and re-level the structure. Non-invasive, fast cure, suitable for lighter structures.

04

Pier & Beam Underpinning

Concrete piers with reinforced beams designed to redistribute building loads to stable ground. Used where conventional underpinning isn't practical.

05

Foundation Restumping

Replacement of deteriorated or failed timber or concrete stumps with new engineered supports. Common in older Sydney homes with subfloor access.

06

Drainage & Root Management

Addressing the cause of foundation movement. Subsurface drainage, root barriers, and moisture management to prevent future settlement.

Recent work

Underpinning projects.

A selection of recent underpinning projects across Sydney.

View all projects
Our process

Measure twice. Underpin once.

Every underpinning project follows our structured five-step process. Engineer-led, fully documented, and certified on completion.

Site Inspection

We attend site, inspect the building for signs of movement, document damage with photos and level surveys, and assess likely causes. This becomes the brief for engineering.

Engineering Assessment

A structural engineer (and geotechnical engineer where needed) reviews the findings and designs the underpinning solution. This specification defines the method, depth, and sequence.

Underpinning Plan

We develop the full scope of works from the engineering specification, methodology, staging, access requirements, materials, and a clear, itemised quote.

Execution On Site

Our team carries out the underpinning in strict sequence per the engineer's specification. Work is documented at every stage with photos and inspection records.

Certification & Handover

On completion, the structural engineer inspects and certifies the work. You receive full documentation for your records, council, insurance, or future sale.

A stable foundation, and proof it's been done right.

Engineering reports, level surveys, photos at every stage, and certification on completion. Critical for insurance, council compliance, and property resale.

Why choose METCON

Sydney's underpinning specialists.

Most builders guess at foundations. We engineer them. Every underpinning project is led by qualified engineers, documented end-to-end, and certified on completion, so your building stays stable for good.

Engineer-Led

Every job is designed and certified by a qualified structural engineer.

Geotechnical Informed

We coordinate soil testing to ensure the underpinning method suits your site.

Licensed Builder

Meteora Constructions Pty Ltd, fully licensed in NSW with all required insurances.

Honest Quoting

Itemised, fixed-price quotes. No surprise variations halfway through the job.

Minimal Disruption

Staged works planned to keep your home liveable or your business running.

40+ Years Experience

Hands-on Sydney building experience going back to the 1970s.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks.
MSMichael Stavros Vaucluse
Council approval sorted, engineering sorted, wall done in a week. Could not fault the process.
DRDavid Reeves Manly
We needed a large gabion wall for a steep commercial block. Engineered, certified, and done on time. Professional from start to finish.
AMAnthony Moretti Parramatta
Underpinning FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

Do you handle council approvals and engineering?

Yes. We manage the entire process, including:

  • Coordinating with structural engineers
  • Preparing documentation
  • Lodging Development Applications or Complying Development Certificates
  • Liaising with council on your behalf

You do not need to deal with council directly. We handle it all.

What is included in your quotes?

Every METCON quote is fully itemised and includes:

  • Scope of work
  • Materials and specifications
  • Labour costs
  • Excavation and site preparation
  • Drainage (where applicable)
  • Engineering fees
  • Council application fees
  • Project timeline and payment schedule

There are no hidden costs. What we quote is what you pay, unless you request changes to the scope.

What payment terms do you offer?

We use a progress payment structure, which means you pay in stages as the work is completed. This is standard practice in the NSW building industry and protects both parties.

The exact payment schedule depends on the project size and is set out clearly in your quote. We never ask for full payment upfront.

What happens if something goes wrong during the build?

Construction can sometimes uncover unexpected issues, especially on older properties or difficult sites.

If we find something outside the original scope, such as hidden asbestos, unstable soil or structural defects, we tell you immediately, explain the options and give you a clear cost for any additional work before proceeding.

You are never hit with surprise bills.

Other civil & structural services

More civil & structural services.

We cover the full scope of civil & structural work with one licensed team.

Back to Civil & Structural
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Sydney-wide underpinning services.

We service all of Sydney and surrounding regions, from harbourside terraces to outer-west estates and everything in between.

MosmanManlyCremorneLane CoveChatswoodHornsbyParramattaStrathfieldBurwoodConcordHunters HillDrummoyneFive DockLeichhardtNewtownSurry HillsPaddingtonBondiRandwickCoogeeMaroubraSutherlandHurstvilleKogarahCronullaEngadinePenrithLiverpoolCampbelltownWollongongCentral Coast+ Greater Sydney
Let's get started

Don't wait for the cracks to grow.

Foundation problems only get worse with time. Send us photos of the damage, and we'll tell you whether you need underpinning or just monitoring. No pressure, no sales pitch, straight talk from people who actually build.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote