Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Settlement and Cracking in Apartment Buildings on Reactive Clay

23 November 2026 · 4 min read · By the METCON team

Large parts of Sydney sit on reactive clay soils that swell when wet and shrink when dry. Houses are the best known victims, but low-rise apartment blocks, townhouse complexes and their boundary walls can crack too, especially those on shallow footings.

Signs of foundation movement

  • Stepped cracks in brickwork, often from window and door corners.
  • Cracks that open and close with the seasons.
  • Doors and windows sticking or not latching.
  • Gaps between floors and skirting boards, or sloping floors.
  • Cracking in paths, driveways and courtyards close to the building.
Brickwork shows foundation movement as stepped cracking.
Brickwork shows foundation movement as stepped cracking.

Common triggers

  • Leaking stormwater or sewer pipes saturating clay on one side.
  • Large trees drawing moisture from under footings in dry periods.
  • Poor site drainage with water ponding against walls.
  • Long droughts followed by heavy rain.

Investigation

A structural engineer inspects the cracking pattern, and may ask for crack monitoring over months, drainage and plumbing checks, and a geotechnical report on the soils and footings. Monitoring shows whether movement is ongoing or historic. See types of wall cracks.

Repair options

  • Fix the water first. Repair leaking pipes and improve drainage. Often this alone stabilises the building.
  • Manage trees. Root barriers or tree works, subject to council rules.
  • Crack repairs. Brick stitching and repointing once movement has settled. See brick stitching.
  • Underpinning. Where footings are inadequate, the engineer may specify underpinning parts of the building.

Structural crack repairs

We carry out drainage fixes, crack repairs and underpinning on apartment buildings and townhouse complexes to engineers' designs. See underpinning and crack repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

Frequently asked questions

Do all cracks mean the building is sinking?

No. Many cracks are from shrinkage or seasonal movement and are not structural. An engineer can tell the difference.

Is underpinning always needed?

No. Fixing drainage and leaks often stabilises the soil. Underpinning is used when footings are inadequate.

Who pays for foundation repairs in strata?

Footings and external walls are usually common property, so the owners corporation is normally responsible.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote