Detailed inspections, defect reports, expert witness reports and fixed-price rectification quotations, prepared by licensed builders who fix defects for a living. Written for NCAT, the courts, insurers and owners corporations.
When building work goes wrong, the outcome usually depends on evidence: what is defective, why, what it will take to fix and what that costs. We inspect the work, document every item and prepare reports and fixed-price quotations that a Tribunal member, judge, insurer or strata committee can rely on. We are builders first, so our scopes are buildable and our costs are real.

Nine report and quotation services, prepared by a licensed, DBP registered builder with 40+ years on Sydney sites.

If you are taking a builder to NCAT, or defending a claim, the expert report usually decides the case.
Learn more
Building disputes that go to court turn on expert evidence.
Learn more
When a dispute turns on what it will cost to fix defective or incomplete work, you need a real builder's quote, not a guess.
Learn more
When NCAT directs a Scott Schedule, every defect needs to be listed, described, explained and costed in a way both sides and the Tribunal can work through.
Learn more
Storm damage, burst pipes, leaks, fallen trees and impact damage.
Learn more
Cracks, leaks, uneven floors, poor finishes or work that does not match the plans.
Learn more
Leaking balconies, cracked facades, failed waterproofing, fire safety defects and concrete cancer.
Learn more
When a builder goes insolvent, disappears, dies or has their licence suspended, or the contract is terminated, you need to know what it will cost to finish the job and fix what was done wrong.
Learn more
Before excavation, demolition, underpinning or major building work, a dilapidation report records the existing condition of neighbouring properties and public assets.
Learn moreTell us about the dispute or claim. We will recommend the right report and confirm a fixed fee.
Ask us what you needMany building reports are written by people who have never had to fix what they are describing. Our reports come from builders who rectify defects in houses and apartment buildings every week, so we know how defects happen, what a proper fix involves and what it really costs.
When we act as an expert, our duty is to the Tribunal or court. We give an honest, reasoned opinion on every item, including the ones that are not defects, because that is what makes a report persuasive.
Fixed fee agreed upfront. Five clear stages from brief to resolution.
Tell us what the report is for and send the contract, plans, photos, correspondence and any Tribunal directions. We confirm the scope, timing and a fixed fee in writing before we attend.
We inspect, measure and photograph every item, take moisture readings and carry out non-destructive checks where they help. Each item is numbered and located.
Each item is assessed against the contract, the approved plans, the National Construction Code, Australian Standards and the manufacturer's instructions, and we identify the cause, not just the symptom.
You receive a written report with our opinion and reasons for each item, the scope of work to fix it and an itemised, fixed-price costing that shows how every figure was calculated.
We answer questions, prepare supplementary reports if new information comes to light, and attend an expert conclave, joint report or hearing when directed, with those fees agreed in advance.
A family builder with the licences, insurance and engineering discipline to do the job properly.
The cost of the inspection and report is agreed in writing before we attend.
Written to NCAT Procedural Direction 3 and the court expert code of conduct.
Each defect scoped and priced, with preliminaries, margin and GST shown.
Licensed builder 384697C and DBP registered BUP4254812.
Real reviews from METCON clients.
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
Common questions about building reports, expert evidence and rectification quotes.
A written report by a person with specialised building knowledge, giving their opinion on issues such as whether work is defective, what caused it, how it should be fixed and what that will cost, for use in a Tribunal, court or insurance claim.
Yes. Our expert reports are written to NCAT Procedural Direction 3, which applies to Home Building Act claims over $30,000, and include the code of conduct acknowledgement, our qualifications, the instructions, the facts and assumptions, our reasons and the scope and cost of rectification.
Yes. Rectification and completion quotes are itemised and fixed price, with assumptions and exclusions stated, and the report fee is fixed and agreed before we attend.
Yes. An expert's duty is to the Tribunal or court, not to the party paying. We disclose any relationship with the parties and whether we have quoted to do the work.
Yes, when directed or requested. Conclaves, joint reports and hearing attendance are quoted separately and agreed in advance.
The contract, plans, photos, any existing reports, correspondence with the builder or insurer, and any Tribunal or court directions with their dates.
Send the documents you have and your deadline. We will confirm the right report, the timing and a fixed fee.
Plain-language guides from our team on the questions we are asked most.