Waterproofing Defect Claims at NCAT: Proving the Leak

19 November 2026 · 4 min read · By the METCON team

Failed waterproofing is one of the most common defects in NSW homes and apartments, and one of the most common NCAT claims. It is also one of the most argued, because the membrane is hidden under tiles. Proving it takes more than a photo of a stain.

What you need to prove

  1. Water is getting where it should not.
  2. The cause is defective waterproofing work, not something else such as plumbing, condensation or a cracked tile from impact.
  3. The work does not meet the contract, the Building Code or the waterproofing standard (AS 3740 for internal wet areas, AS 4654 for external balconies and decks).
  4. For a six year claim, that it is a major defect.
  5. What it costs to fix properly.
The layers of a wet area waterproofing system.
The layers of a wet area waterproofing system.

Testing that proves the cause

  • Moisture mapping to show where water is spreading.
  • Flood testing of a shower base or balcony, with the drain plugged.
  • Isolating plumbing to rule out a pipe leak.
  • Opening up: lifting a tile or cutting a small inspection point to see the membrane, upturns and falls.

See balcony flood testing.

Common waterproofing defects

  • No membrane, or a membrane that stops short.
  • Upturns too low at walls and doors.
  • Missing bond breakers or flashings at junctions.
  • Falls to the wrong place, so water ponds.
  • Puddle flanges missing or not sealed at drains.
  • Door sills set too low, with no step down or set-down.

Is it a major defect?

Waterproofing is a major element. Whether a particular failure is a major defect depends on the consequences, such as damage to framing or a room that cannot be used. See the major defect test.

Why the fix is usually bigger than it looks

Waterproofing cannot normally be fixed by regrouting. A proper fix usually means removing tiles and screed, replacing the membrane and retiling, sometimes with framing and plaster repairs. Your quote should show each step. See can a shower be fixed without removing tiles.

Waterproofing reports and quotes

We test, report and price waterproofing defects for NCAT, and carry out the rectification. See NCAT expert reports, fixed-price rectification quotes and remedial waterproofing. The fee is fixed and agreed in writing before the inspection, so you know the cost of the report before you commit. METCON is a licensed builder (384697C) and DBP registered (BUP4254812), and we fix building defects for a living. Call 0415 840 500 or request a report or quote. We confirm a fixed fee in writing before we start.

This article is general information, not legal advice. For your situation, speak to a lawyer, NSW Fair Trading or the Tribunal.

Frequently asked questions

Is a waterproofing certificate proof the work was done properly?

No. A certificate says the installer believes it complies. If it leaks, testing and inspection decide what actually happened.

Can the builder just seal the grout?

Sealing can hide a symptom for a while but does not fix a failed membrane. An expert report explains why the proper fix is needed.

Who pays for testing?

Testing is built into the agreed report fee where it is needed to prove the cause. We tell you before the inspection if testing is likely.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Inspections & Reports
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Need a report for NCAT, court or insurance?

Fixed fee agreed before we start. Clear findings, an itemised scope and a fixed-price rectification quote.

Call now Request Report