Balcony Flood Testing: How It Works and Why It Matters

10 November 2026 · 4 min read · By the METCON team

Once tiles go down, nobody can see the membrane again without removing them. A flood test checks the waterproofing while it is still exposed, so problems can be fixed before they are buried.

How a flood test works

  1. The membrane is fully cured.
  2. Drains are plugged and the edges dammed.
  3. Water is held on the balcony to a set depth.
  4. It is left for a set period, commonly 24 hours or as specified.
  5. The area below and around is checked for leaks.
  6. Results and photos are recorded.
Waterproofing steps before a flood test.
Waterproofing steps before a flood test.

What it proves

  • The membrane and its details hold water at the time of testing.
  • Drains, upstands and penetrations are sealed.

What it doesn't prove

  • It doesn't test wind-driven rain on walls and door frames above water level.
  • It doesn't show the long-term durability of the system.

Testing door sills and walls

Separate water testing may be used for door frames and walls. See upstands and sliding doors.

Record it

Keep the date, duration, photos and result with the strata records. It helps with warranties and future buyers. See warranties.

How flood testing helps

It catches mistakes when they are cheap to fix and gives owners confidence that the membrane works.

Waterproofing with testing

We flood test balcony waterproofing where suitable and keep the records. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

How long does a balcony flood test take?

Commonly 24 hours, or as set out in the specification, after the membrane has cured.

Is a flood test required?

It depends on the specification and project. It is good practice before tiling where suitable.

Does a flood test guarantee no leaks?

It shows the membrane holds water at the time. It does not test wind-driven rain on walls or long-term durability.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote