Owners corporations spend a lot on balcony waterproofing, so they want to know it is protected. Warranties can help, but only if the scheme understands what they cover and keeps the right records.
This is general information from a builder, not legal advice. Your strata manager or lawyer can advise on your building.
Types of warranty
- Statutory warranties: under the Home Building Act, residential building work generally carries statutory warranties for defects, with longer periods for major defects. Get advice on how they apply to your works.
- Workmanship warranty: the builder's written warranty on their work.
- Product warranty: from the membrane manufacturer, often with conditions.

Questions to ask
- What exactly is covered, and for how long?
- Is the product warranty conditional on approved installers or inspections?
- What maintenance must the scheme do to keep it valid?
- What is excluded, such as owner damage or later fixings?
- Who do you contact, and what happens if the builder is no longer around?
Records that support a warranty
- Photos of the membrane before tiling.
- Flood test records. See flood testing.
- Product data and batch details.
- Certificates and compliance documents. See waterproofing certificates.
Protect it after handover
- Keep drains clear.
- Stop owners drilling into floors. See fixings that leak.
- Report leaks quickly and in writing.
How good warranties help
Clear warranties and records give owners confidence, help with future sales and make claims much easier if something goes wrong.
Waterproofing with full records
We provide warranties, photos and test records on our balcony waterproofing. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How long is a balcony waterproofing warranty?
It depends on the builder, product and statutory warranties. Ask what is covered and for how long, in writing.
What can void a waterproofing warranty?
Common examples are lack of maintenance, blocked drains and owners drilling through the membrane.
What records should we keep?
Membrane photos, flood tests, product data, certificates and warranties.


