Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Balcony Screens and Air Conditioners: Fixings That Leak

10 November 2026 · 4 min read · By the METCON team

Owners often add privacy screens, awnings, air conditioners, clotheslines and pot stands to balconies. Each fixing that goes through the tiles or into a wall junction can break the membrane underneath and cause a leak.

Common culprits

  • Screen posts screwed into the floor.
  • Air conditioner brackets bolted through the tiles.
  • Awning brackets fixed into walls below the membrane line.
  • Condensate pipes from air conditioners draining onto tiles or into planters.
  • Satellite dishes and clotheslines.
Staining from water getting through the waterproofing.
Staining from water getting through the waterproofing.

Signs

  • Leaks below that started after something was installed.
  • Rust stains around fixings.
  • Cracked tiles around brackets.

How it is fixed

  • Removing the fixing, then repairing the membrane and tiles around it, if the rest is sound.
  • Reinstalling with non-penetrating bases, wall fixings above the membrane or sealed systems.
  • Diverting air conditioner condensate to a drain properly.
  • Full re-waterproofing where damage is widespread.

Strata rules

Installing things on common property, such as balcony floors and external walls, generally needs approval and may be covered by by-laws. When balcony works are planned, owner additions often need to be removed and reinstated, and by-laws can set out who pays. See access for works.

A simple building policy

  • No drilling through balcony floors.
  • Approved fixing methods for screens and air conditioners.
  • Condensate to drains only.

How it helps

Good rules prevent new leaks and protect a newly waterproofed balcony for years.

Leak repairs

We repair penetrations and leaks on balconies and advise on better fixing methods. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Can screwing into balcony tiles cause leaks?

Yes. Fixings through tiles can puncture the membrane underneath.

Where should air conditioner condensate go on a balcony?

To a proper drain, not onto tiles, into planters or over the edge.

Do I need strata approval to install a screen on my balcony?

Often, yes, because the floor and walls are usually common property. Check your by-laws.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote