Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Facade Remediation ยท Sydney Facades repaired, protected and restored.

Cracked or drummy render, fretting brickwork, spalling concrete and failed coatings. We repair building facades so they keep water out and look right again.

  • Render repairs
  • Brickwork and repointing
  • Concrete cancer repairs
  • Protective coatings
  • Scaffold and access managed
  • Free site inspection
Talk directly with the builder0415 840 500

Free remedial inspection

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Site assessment and written quote
24h
Itemised quote after the site visit
$20M
Public liability insurance cover
Facade remediation

The facade keeps the weather out.

A facade is the building's first line of defence. When render cracks, mortar joints erode or coatings fail, water gets into the wall and starts the chain of defects we repair every week: concrete cancer, rusting lintels, internal damp and loose render that can fall.

Facade work on Sydney buildings is often complicated by height, access and occupants. We plan scaffold or elevated access, staged work zones and protection so residents and businesses can keep using the building.

We repair the substrate first, then finish and protect it. Render is removed back to sound material, cracks and lintels are treated, brickwork is repaired and repointed, and the facade is finished with a coating system suited to its exposure.

Multi-storey face brick facade with infilled openings
DBPRegistered builder
Is this you?

Six signs your facade needs work

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.

Cracked or drummy render

Render that sounds hollow or has visible cracking is letting water in and may come loose.

Eroded mortar joints

Mortar that has recessed or crumbled between bricks or stone.

Rusting lintels over windows

Stepped cracking and rust staining above openings.

Spalling concrete

Concrete cancer on slab edges, columns and beams on the face of the building.

Failed or peeling coatings

Paint and coatings flaking or chalking and no longer protecting the surface.

Damp internal walls

Staining or mould inside rooms along external walls.

Render cracking or pieces falling? Send us photos of the facade and we will tell you how urgent it is.

What we repair

Facade repairs for every building.

Houses, terraces, apartment blocks and commercial buildings. The method changes with the material, the discipline does not.

01

Render Repairs

Remove loose and cracked render, repair the substrate and re-render to match.

02

Brickwork & Repointing

Replace damaged bricks, rake out and repoint joints with a suitable mortar.

03

Lintel Replacement

Replace rusted steel lintels over windows and doors and repair the stepped cracking around them.

04

Concrete Cancer Repairs

Treat spalling slab edges, columns and beams on the facade.

05

Sandstone Repairs

Repair and replace weathered sandstone elements on older and heritage buildings.

06

Protective Coatings

Breathable, weather-resistant coating systems to protect the repaired facade.

Recent work

Facade Repairs projects.

A selection of recent facade repairs projects across Sydney.

View all projects
Our process

Repaired from the substrate up.

Every facade job follows the same five steps, from inspection to handover.

Inspection & Diagnosis

We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.

Scope & Engineering

We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.

Itemised Quote

You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.

Remediation

Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.

Handover & Warranty

Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.

A facade that protects the building again.

Photos of the substrate repairs before they are covered, product data for every system used, and a clear handover record.

Why choose METCON

Sydney's facade remediation builders.

A coat of paint over cracked render is not a repair. We fix what is behind the surface first, then finish it to last.

Cause, Not Cosmetics

We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.

DBP Registered

DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.

Licensed & Insured

Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.

Engineer-Coordinated

We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.

Documented Properly

Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.

40+ Years Experience

Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from homeowners, strata and builders.

We have been undertaking a considerable repair and restoration of our 1850 residence in Darlinghurst. Constatine and his team completed outstanding work, all at a very competitive price. Every deadline was met with no increase to the original quote. Their knowledge, gathered over many years, and their incredible eye for detail significantly improved the final outcome beyond what was originally proposed. I rate them very highly and would recommend them wholeheartedly.
NDNicholas Davie Darlinghurst
Constatine and his team were outstanding from start to finish. They responded quickly, arrived on time for the quote, and once awarded the project, completed everything on schedule. The property was built in 1880 and presented a very difficult scope of work, but the team handled it expertly. We received regular updates, excellent advice, and the quality of workmanship was exceptional. They were also extremely tidy throughout the process. I could not recommend METCON highly enough.
MMatthew Enmore
Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
MMish Annandale
Facade Repairs FAQ

Common questions.

Straight answers from the builder. Anything else, just ask.

What is remedial building?

Remedial building is the repair of defects, damage and deterioration in existing buildings, such as concrete cancer, leaking balconies, failed waterproofing, rising damp and cracked facades. The aim is to fix the underlying cause and restore the building's performance, not just its appearance.

Do I need a DBP registered builder for strata remedial work?

For Class 2 apartment buildings in NSW, remedial work is regulated under the Design and Building Practitioners Act 2020. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out that work and lodge the required declarations.

How much does remedial building work cost?

It depends entirely on the defect, its extent, access and the specification. A small concrete cancer patch is very different from a whole-building balcony programme. We inspect for free and provide an itemised written quote so you can see exactly where the money goes.

Is remedial work covered by warranty?

Residential building work in NSW carries statutory warranties under the Home Building Act 1989: six years for major defects and two years for other defects. We provide full documentation at handover.

More remedial services

Other remedial services.

Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.

Back to Remedial Building
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

GuideConcrete Cancer in Window Hoods, Sills and AwningsRead the guide GuideOne Scaffold, Many Fixes: Bundling Facade, Window and Balcony WorkRead the guide GuideAnti-Carbonation Coatings and Silane Sealers for ConcreteRead the guide GuideWater Coming Through Brick Walls? Causes and FixesRead the guide GuideConcrete Cancer in Coastal Buildings: Salt Air and RepairsRead the guide GuideFailed Sealants and Expansion Joints: Why Buildings LeakRead the guide GuideFacade Restoration in Sydney: Choosing a Facade Remedial ContractorRead the guide GuideCracked Render: Causes, Repairs and When It Is a Bigger ProblemRead the guide GuideRepointing Brickwork: When Mortar Needs Repair and How It Is DoneRead the guide GuideRepainting Your Strata Building? Fix These Remedial Issues FirstRead the guide GuideWall Tie Corrosion: Signs and Wall Tie ReplacementRead the guide GuideParapet Wall Leaks: Capping, Flashings and RepairsRead the guide GuideScaffold, Swing Stage or Rope Access: Facade Repair OptionsRead the guide GuideFalling Concrete or Render: What Building Owners Must DoRead the guide GuideWindow Wall Leaks in Apartment Towers: Causes and RepairsRead the guide GuideLoose and Falling Facade Tiles on Apartment BuildingsRead the guide GuideWindow Sealant Replacement on Apartment BuildingsRead the guide GuideRender Repair Cost in Sydney: Patch, Re-render or Coat?Read the guide GuideWhy Balcony Edges Stain: Drip Grooves and Edge DetailsRead the guide GuideBalcony Screens and Air Conditioners: Fixings That LeakRead the guide GuideEnclosing an Apartment Balcony in NSW: What You Need to KnowRead the guide GuideHairline Cracks in Render: Cosmetic or Serious?Read the guide GuideRoof Anchors and Height Safety for Apartment BuildingsRead the guide GuideWindow Replacement in Strata Buildings (NSW)Read the guide GuideElastomeric Coatings on Apartment Facades: Pros and ConsRead the guide GuideDrummy Render on Apartment Buildings: Risks and RepairsRead the guide GuideWall Tie Replacement in Sydney Apartment BuildingsRead the guide GuideFacade Cleaning and Sealing for Apartment BuildingsRead the guide GuideRusted Lintels in Apartment Buildings: Signs and RepairsRead the guide GuideNeighbour Access for Scaffold and Remedial Works in NSWRead the guide
Where we work

Facade repairs across Sydney.

Apartment blocks, terraces, houses and commercial buildings right across Sydney.

Let's get started

Send us photos of the facade.

A few photos of the cracking or damage and the building height is enough for an initial view and access plan.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Free Quote