Tap rendered walls with a small hammer. Solid render gives a sharp sound. Render that has lost its bond to the wall sounds hollow, or "drummy". On a high facade, drummy render can eventually fall, which is a real danger to people below.
Causes
- Water getting behind the render through cracks, failed sealants or parapet cappings.
- Poor preparation when the render was applied, so it never bonded well.
- Render too thick, or too strong for the masonry under it.
- Thermal movement on sunny elevations.
- Rusting steel behind the render, such as lintels or reinforcement.

Warning signs
- Bulges or blisters in the render.
- Cracks around a patch, often in a rough circle.
- Pieces already fallen onto balconies, paths or cars.
- Rust staining coming through.
Make safe first
If render has fallen or is visibly loose, close off the area below and get loose render removed straight away. See falling concrete and render.
Survey
A full facade tap survey from scaffold, swing stage or rope access maps every drummy area on drawings or photos. That gives a measured quantity for pricing and stops surprises once the work starts.
Repair
- Cut out drummy render back to sound edges.
- Find and fix the water source.
- Treat any rusting steel found behind it.
- Prepare the substrate and re-render in compatible layers.
- Coat to match.
Where most of a wall is drummy, a full strip and re-render may be better value than many patches. See patch or re-render.
Render repairs for strata
We survey and repair facades on occupied apartment buildings. See facade repairs and strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Can drummy render be glued back?
Small areas can sometimes be pinned and injected, but most drummy render is removed and replaced, because the cause usually remains.
How often should facades be checked?
A visual check every year and a closer inspection every few years, especially on older and coastal buildings.
Is drummy render a building defect?
In newer buildings it can be, if it is caused by poor workmanship or detailing. Get it assessed within the warranty period.