A chunk of concrete or render on the footpath, driveway or balcony below is one of the most serious warnings a building can give. Even a small piece falling from height can seriously hurt someone. Treat it as a safety issue first and a repair issue second.
The first hours
- Keep people clear. Barricade the area below, including footpaths, entries, balconies and car spaces. Call emergency services if there is immediate danger.
- Tell the right people. That usually means your strata manager or building manager, and the committee or owner. Leave a written record with date, time and location.
- Take photos, from a safe place, of the fallen material and where it came from. Keep the pieces.
- Arrange an urgent inspection by a builder or engineer who can check whether more is loose.
- Tell your insurer if anyone is hurt or anything is damaged.

Making it safe
Emergency make-safe usually means removing loose material, netting or protecting the area, or putting up overhead protection. Safe does not mean fixed. It only buys time for a proper diagnosis.
Why it happens
- Concrete cancer: rusting steel expands and pushes the concrete off. See what is concrete spalling.
- Drummy render: render separates from the wall behind and eventually lets go. See cracked render repairs.
- Old patch repairs: poor repairs can debond and fall off.
- Corroded wall ties and lintels: these can loosen brickwork. See wall ties and lintels.
Who is responsible?
In a strata scheme, the owners corporation is generally responsible for maintaining common property, and facades and slab edges usually fall into that category. See who is responsible for strata repairs. For commercial buildings, check the lease and ownership. Knowing about a hazard and not acting can make things much worse, so get legal or insurance advice if someone has been hurt.
What happens next
- A close inspection, including tapping and testing nearby areas.
- Engineering advice where the structure may be involved.
- A scope of repairs across the affected elevation, not only the one spot.
- Proper repairs, followed by protective coatings where needed.
How repairs protect your building
Dealing with it properly protects people below, reduces liability, and stops one small area of damage turning into a whole-facade project.
Urgent help
We can inspect, make safe and repair falling concrete and render on apartment and commercial buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What should I do if concrete falls off my building?
Keep people clear, barricade the area, report it in writing, take photos and arrange an urgent inspection by a builder or engineer.
Is falling concrete a strata responsibility?
Usually, because slab edges and facades are generally common property, but it depends on the strata plan. Your strata manager can confirm this.
Does one piece falling mean the building is unsafe?
Not necessarily, but it does mean more material may be loose. An inspection is needed to work out how far the problem goes.


