"Who pays?" is the most common question in strata. In NSW the answer usually depends on whether the item is common property or part of a lot, and that depends on the strata plan.
The basic rule
- Owners corporation: repairs and maintains common property.
- Lot owner: repairs and maintains their own lot.
Where the boundary usually sits
For most strata plans registered after 1 July 1974, the boundary of a lot is generally the inner surface of walls, floors and ceilings. That means the structure itself is usually common property. Older plans can differ, so check your strata plan.
Common items
| Item | Usually |
|---|---|
| Building structure, slabs, external walls | Owners corporation |
| Roofs, box gutters, facades | Owners corporation |
| Balcony slabs and original waterproofing | Owners corporation |
| Original bathroom waterproofing | Often owners corporation |
| Windows and frames in external walls | Often owners corporation |
| Internal fixtures, finishes and fittings | Lot owner |
| Owner renovations and additions | Lot owner, often by by-law |
By-laws, especially common property rights by-laws for renovations, can shift responsibility. Always check.
Leaks between units
Responsibility usually follows the source of the leak. See water leaking from the unit above.
Getting repairs done
- Report the problem to the strata manager in writing, with photos.
- Ask for an inspection to identify the cause.
- For common property, the owners corporation organises and pays for repairs.
- If repairs stall, NSW Fair Trading mediation and NCAT are available.
Strata remedial works
METCON is DBP registered for Class 2 buildings and works with strata managers on common property repairs. See our strata remedial service.
Frequently asked questions
Who is responsible for repairs in NSW strata?
Generally the owners corporation for common property and the lot owner for their lot. The strata plan and by-laws decide the detail.
Is balcony waterproofing common property?
In most NSW strata schemes, yes, so the owners corporation is usually responsible.
What can I do if the owners corporation will not fix a defect?
Put it in writing, then use NSW Fair Trading mediation and, if needed, NCAT.


