It is one of the most common surprises in a Sydney renovation. The old bathroom or balcony tiles come up, or a ceiling comes down, and underneath is cracked concrete, rust stains and reinforcing steel that looks more like flaky orange pastry than steel. That is concrete cancer, and it changes the plan.
Stop and make it safe
- Stop work in that area. Do not keep chipping at it to "see how far it goes".
- Do not load the area with tile stacks, rubble bags or heavy equipment.
- If concrete is loose overhead, keep people out from underneath it.
- Take clear photos with something in shot for scale, and note the date.

Work out who is responsible
In a house, the repair is yours. In an apartment, the concrete slab is usually common property, even when the tiles on top belong to the lot. That means the owners corporation is normally responsible for the slab repair, and you should tell the strata manager straight away, in writing, with the photos. Renovating over a known structural defect without telling the strata can create problems later. See who is responsible for repairs in strata.
Get the extent assessed
What you can see is rarely the whole problem. Corrosion spreads along the bars well past the visible damage. A remedial builder or engineer will sound the surrounding concrete, check the cover to the steel and may test for carbonation or chlorides. That decides whether it is a patch repair, a bigger structural repair or something that needs an engineer's design. See signs of concrete cancer.
How the repair fits into your renovation
- The damaged concrete is cut back to sound material and behind the bars.
- Steel is cleaned, treated, and replaced or supplemented where it has lost section.
- The concrete is rebuilt with a repair mortar suited to the depth and location.
- Curing time is allowed before waterproofing and finishes go back on.
Your renovation can usually continue once the repair is done and signed off, but it will add time. Plan for it rather than rushing the finishes over it.
Fix the cause, not just the hole
Concrete cancer starts with water, salt or carbonation reaching the steel. In bathrooms and balconies the cause is almost always failed waterproofing or poor falls. If the new waterproofing is not done properly, the cancer will come back. See how long concrete cancer repairs last.
We can help
We assess and repair concrete cancer found mid-renovation, and work with strata managers when the slab is common property. See concrete cancer repair. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Can my tiler just patch it and tile over?
No. A surface patch over corroding steel traps the problem and it will crack again, often through your new tiles. The steel must be exposed, treated and the concrete properly rebuilt.
Who pays if I find it in my apartment?
The slab is usually common property, so the owners corporation is normally responsible for the structural repair. Your finishes may be your cost. Check your strata plan and by-laws.
Will it hold up my renovation?
Usually by days to a few weeks, depending on the size of the repair and curing time. It is far cheaper to fix it now than to rip out new finishes later.