Some Sydney buildings, particularly older concrete blocks close to the ocean or harbour, have so much salt in their concrete that patch repairs never seem to end. Every few years another round of cracking and spalling appears. For these buildings, cathodic protection is worth understanding.
The basic idea
Steel corrodes because of a tiny electrical current flowing between rusting and non-rusting areas. Cathodic protection reverses that current, so the steel stops corroding even if the concrete around it is full of chlorides.
Two main types
- Galvanic (sacrificial) systems. Zinc anodes corrode instead of the steel. No power needed. Often used around patch repairs. See galvanic anodes.
- Impressed current systems. Anodes are installed in or on the concrete and connected to a small power supply that drives a controlled current into the steel. These protect large areas and can be adjusted and monitored over time.
When it is worth considering
- Chloride levels are high through large areas of the structure.
- Conventional patch repairs keep failing around their edges.
- Removing all contaminated concrete would mean huge breakout, noise and propping.
- The building has a long future, so a long-life solution makes sense.
What owners need to know
- It is engineer-designed. Testing comes first: chloride profiles, cover, potential mapping and continuity checks of the steel.
- Installation involves cutting slots or drilling holes for anodes, then making good. It is still building work, with access and noise.
- Impressed current systems need ongoing monitoring by a specialist, so there is a maintenance cost each year.
- Waterproofing still matters. Keeping water out slows everything down.
Our role
Cathodic protection systems are designed and commissioned by specialist corrosion engineers. As a remedial builder we carry out the building side: access, concrete breakout and reinstatement, waterproofing, tiling and coordinating trades so the building is left finished. See concrete cancer in coastal buildings and concrete cancer repair. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Is cathodic protection permanent?
It is a long-life system, but impressed current systems need monitoring and occasional maintenance, and anodes have a design life.
Is it only for big buildings?
It is most common on larger concrete structures, but galvanic systems are used on smaller repairs too.
Does it replace patch repairs?
Not entirely. Loose and spalled concrete still has to be repaired. Cathodic protection stops new corrosion in the concrete that stays.