Scott Schedules ยท NCAT Scott Schedules, itemised and costed.

When NCAT directs a Scott Schedule, every defect needs to be listed, described, explained and costed in a way both sides and the Tribunal can work through. We prepare and cost Scott Schedules from our own inspection or from your expert's report.

  • NCAT Scott Schedules
  • Each defect itemised and located
  • Cause and rectification for each item
  • Fixed-price costing per item
  • Responses to the other side
  • Licensed builder 384697C
Talk directly with the builder0415 840 500

Request a report or quote

We call you back

Confidential. We confirm a fixed fee before any work starts.
40+
Years building and repairing in Sydney
Fixed
Report fee agreed before we start
PD3
Written to the NCAT expert code of conduct
DBP
Registered builder, including Class 2
What a Scott Schedule is

One table the whole case turns on.

A Scott Schedule is a table that lists each item of defective or incomplete work in a building dispute. NCAT describes it as a form that lets the parties itemise the defective and incomplete work, and it is generally used in complex matters or where there are many defects. The Tribunal can direct the parties to prepare one along with their expert reports.

Each row usually sets out the item number, where it is, what is wrong, why it is a defect, what is needed to fix it and what that costs, with columns for the other side's response and their expert's view. When it is done well, the member can decide the case item by item. When it is vague or uncosted, items get disallowed.

We prepare Scott Schedules as builders who price this work for a living. Each item is tied to a photo and a location, the rectification scope is buildable and the cost is a real Sydney rate, so the schedule holds up when the other side's expert goes through it line by line.

A defect photographed and recorded for a schedule
40+Years building in Sydney
Is this you?

When you need a Scott Schedule

If any of these sound familiar, it is worth a call. We will tell you which report or quotation will help, and confirm a fixed fee before we start.

NCAT has directed one

The Tribunal has made directions that include a Scott Schedule and a filing date.

Many defects in dispute

There are dozens of items and the member needs a clear way to work through them.

Your report has no costs

You have an inspection report that lists defects but does not price them.

You need to respond to one

The other side has served a Scott Schedule and you need a builder's response to each item.

An expert conclave is coming

Experts will meet to narrow the issues, and a clear schedule makes that meeting work.

Strata common property defects

An owners corporation claim with defects spread across many lots and areas.

Got a Scott Schedule template from the Tribunal or your lawyer? Send it with your directions and we will fill and cost it.

What we prepare

Every item, every column, every cost.

We work in the format the Tribunal or your lawyer has asked for, and keep item numbers consistent across every document.

01

Item Description and Location

A clear description of each defect and exactly where it is, cross-referenced to photos.

02

Why It Is a Defect

The contract term, plan, National Construction Code clause or Australian Standard it does not meet.

03

Rectification Method

The work needed to fix each item properly, and any reasonable alternative.

04

Item-by-Item Costs

A fixed cost for each item at current Sydney rates, with shared costs like scaffolding shown separately.

05

Responses to Opposing Items

Our response to each item claimed by the other side, with reasons, when we are engaged to respond.

06

Conclave Ready

A schedule that makes it easy for experts to record agreed items and narrow what is left in dispute.

Our process

Clear, consistent, costed.

Whether we inspect from scratch or work from your existing report, the schedule is checked against the site.

Brief & Fixed Fee

Tell us what the report is for and send the contract, plans, photos, correspondence and any Tribunal directions. We confirm the scope, timing and a fixed fee in writing before we attend.

Site Inspection

We inspect, measure and photograph every item, take moisture readings and carry out non-destructive checks where they help. Each item is numbered and located.

Assessment

Each item is assessed against the contract, the approved plans, the National Construction Code, Australian Standards and the manufacturer's instructions, and we identify the cause, not just the symptom.

Report & Costing

You receive a written report with our opinion and reasons for each item, the scope of work to fix it and an itemised, fixed-price costing that shows how every figure was calculated.

Support to Resolution

We answer questions, prepare supplementary reports if new information comes to light, and attend an expert conclave, joint report or hearing when directed, with those fees agreed in advance.

Fewer arguments, faster decisions.

A clear, costed Scott Schedule helps the experts agree more items in a conclave, which means a shorter hearing and lower legal costs.

Why choose METCON

Scott Schedules from working builders.

We know how each defect happens and what it costs to fix, because we fix them. That is what makes our schedules hard to argue with.

A Builder, Not Just an Inspector

We have built and repaired buildings in Sydney for over 40 years, so our scopes are buildable and our costs come from what the work really takes.

Licensed & DBP Registered

Builder licence 384697C and DBP General Unrestricted registration BUP4254812, including Class 2 apartment buildings.

Written for the Tribunal

Reports follow the structure NCAT and the courts expect: instructions, facts and assumptions, reasons for each opinion and the code of conduct acknowledgement.

Fixed Fee, Agreed Upfront

You know the cost of the inspection and report before we attend. No hourly meter running in the background.

Itemised, Defensible Costs

Every item is scoped and priced separately, with preliminaries, access, waste, supervision, margin and GST shown, so the numbers stand up to scrutiny.

Evidence You Can Use

Dated photos, measurements, readings and references to the relevant standards for every item, laid out so a member or judge can follow it.

What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from METCON clients.

My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Excellent communication throughout. Constatine and his team were able to assist us immediately on an urgent government project, improved the plans we already had, and provided multiple options to suit our needs. Highly recommended.
MMish Annandale
We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar.
KLKaren Lawson Bondi Junction
Scott Schedules FAQ

Common questions.

Straight answers. Anything else, just ask.

What is a Scott Schedule?

A table that lists each item of defective or incomplete work in a building dispute, with each party's position and the cost of rectification. NCAT can direct the parties to prepare one along with their expert evidence.

Can you cost a Scott Schedule from someone else's report?

Yes. We can price the items in an existing expert report, but we will inspect the site first so the scope and costs are reliable.

Can you respond to the other side's Scott Schedule?

Yes. We can review each item claimed against you and give a reasoned response and our own costing where we disagree.

How much does a report cost?

It depends on the size of the property, the number of items and what the report is for. We confirm a fixed fee in writing before we attend, based on your documents and a short call, so there are no surprises.

How quickly can you do it?

Tell us your deadline when you first call. We schedule inspections around Tribunal and court timetables and agree a delivery date upfront. Urgent matters are often possible, but more notice always gives a better report.

More reports and quotes

Other report services.

Most disputes need more than one document: a defect report, a costing, a Scott Schedule and sometimes a hearing. We can prepare them all from one inspection.

Back to Inspections & Reports
Helpful guides

Know more before you start.

Plain-language guides from our team on the questions we are asked most.

Where we work

Scott Schedules for Sydney disputes.

Houses, townhouses and apartment buildings across Sydney and surrounding NSW.

Let's get started

Have a Scott Schedule due?

Send the Tribunal directions, any expert report and your filing date. We will confirm the fee and timing.

Phone, direct to the builder0415 840 500 Email plans or photosinfo@meteoraconstructions.com.au
Open 7 days7am to 7pm, reply within 1 business day
Service areaSydney and surrounding NSW
Call now Request Report