Remedial building for Milsons Point apartment buildings and strata schemes: balcony repairs, concrete cancer, waterproofing and facade repairs right on the harbour.
Milsons Point sits at the northern end of the Harbour Bridge, with apartment towers and mid-rise strata buildings on a small, steep point of land surrounded by water.
Many buildings here have harbour-facing balconies that take wind, rain and salt air directly. Over time that can lead to failed membranes, corroded balustrade fixings and concrete cancer on slab edges. Tight streets and limited loading also make access planning important.

Some Milsons Point buildings and nearby streets have heritage controls, so visible changes may need council approval.
Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.
We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.
You deal directly with the builder, from the first inspection in Milsons Point to the final flood test and handover.
Real reviews from strata buildings and homeowners.
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
Plain-language guides for owners and strata committees.
Straight answers from the builder. Anything else, just call.
It depends on height and the building. Options include scaffold, swing stage and rope access, and much balcony work can be done from inside the apartment. We price the access method that suits your building.
Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Milsons Point apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.
Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.
Many repairs are maintenance and do not, but some works can. Some Milsons Point buildings and nearby streets have heritage controls, so visible changes may need council approval. The council is North Sydney Council. We check what applies before quoting.
It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.
We work right across Lower North Shore and the rest of Sydney. See all service areas.
Free inspection and a straight answer from a licensed, DBP registered Sydney builder.