If you manage, own or sit on the committee of an apartment building, you will hear the term "Class 2" a lot. It is not just jargon. In NSW, a building's class decides which rules apply to work on it, and who is allowed to do that work.
What is a Class 2 building?
The National Construction Code (NCC) sorts buildings into classes by how they are used. A Class 2 building contains two or more sole-occupancy units, each of which is a separate dwelling. In plain terms: apartment buildings and residential flat buildings.

Examples of Class 2 buildings
- Residential apartment towers.
- Walk-up apartment blocks, including 1930s inter-war and 1960s to 1980s red brick blocks.
- Mixed-use buildings, where the apartments above shops are Class 2 (the shops are a different class).
- Many strata-titled buildings, though strata title itself is about ownership, not building class.
What is not Class 2?
- Class 1a: houses, terraces, townhouses and villas, including many dual occupancies.
- Class 3: boarding houses, hostels, backpackers and some residential parts of hotels.
- Class 5 to 9: offices, shops, warehouses, car parks and public buildings.
A strata-titled townhouse complex is often Class 1a, not Class 2, so the class depends on the building, not on whether it is strata.
Why Class 2 matters in NSW
The Design and Building Practitioners Act
Since July 2021, the Design and Building Practitioners Act 2020 has applied to Class 2 buildings. Builders doing building work on them must be registered building practitioners, designs for key building elements must be prepared by registered design practitioners, and compliance declarations must be lodged on the NSW Planning Portal.
Remedial work is included
The rules are not only for new buildings. Work on building elements such as waterproofing, structure, the building enclosure and fire safety systems in an existing Class 2 building can be covered too. That includes many balcony repairs, re-waterproofing and concrete cancer repairs.
Regulator powers
Building Commission NSW has powers over residential apartment buildings, including rectification orders for serious defects.
Duty of care
Those who carry out construction work owe a statutory duty of care to owners, which raises the stakes for doing it properly.
What this means for strata committees
- Check that your builder is a registered building practitioner before engaging them for Class 2 work.
- Expect an engineer or consultant to prepare regulated designs for work on building elements.
- Budget time for designs and declarations before work starts.
- Keep the declarations, designs and photos in your building records.
Class 2 remedial work in Sydney
METCON is a licensed builder (384697C) and DBP registered (BUP4254812). We carry out remedial work on Class 2 apartment buildings and manage the DBP paperwork with your engineer. See our strata remedial service or call 0415 840 500.
Frequently asked questions
What is a Class 2 building in NSW?
A building with two or more sole-occupancy units that are each a separate dwelling, such as apartment buildings and residential flat buildings.
Is a townhouse a Class 2 building?
Usually not. Most townhouses are Class 1a, even when they are strata titled. It depends on how the building is arranged.
Does remedial work on a Class 2 building need a registered builder?
Work on building elements such as waterproofing, structure, the enclosure and fire safety systems generally falls under the DBP Act, which requires a registered building practitioner.