Balcony Defects in New Apartments: What to Look For

10 November 2026 · 4 min read · By the METCON team

Balconies are one of the most common sources of defects in new apartment buildings. Catching problems early, while warranties and bonds apply, makes rectification far easier.

Common balcony defects

  • Water ponding from poor falls. See pooling water.
  • Leaks at door sills, especially level thresholds. See thresholds.
  • Drains set too high or without overflows. See drain repairs.
  • Low or missing membrane upstands. See upstands.
  • Balustrade fixings through the membrane.
  • Cracked or drummy tiles.
  • Planter leaks. See planter leaks.
Staining from a waterproofing defect.
Staining from a waterproofing defect.

What owners should do

  1. Report problems to the strata manager in writing with photos.
  2. Keep a defect register for the building.
  3. Get an independent inspection well before warranty deadlines.
  4. Notify the builder and developer formally.

See the first two years of a new building.

Warranties and bonds

Statutory warranties and, for many buildings, the strata building bond may help. See the bond scheme and defects periods.

If the builder won't fix it

Options include the regulator and legal claims. See rectification orders.

How early action helps

Fixing defects early stops damage spreading and keeps the cost with those responsible.

Defect rectification

We inspect and rectify balcony defects on newer Class 2 buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

What are common balcony defects in new apartments?

Poor falls, leaking door sills, high drains, low upstands, fixings through membranes and planter leaks.

What should I do if my new balcony leaks?

Report it in writing to the strata manager with photos, and make sure the builder is formally notified.

How long do I have to claim balcony defects?

Statutory warranty periods and other time limits apply. Get advice early.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote