RAB Act Orders: What NSW Apartment Developers Need to Know

9 November 2026 · 4 min read · By the METCON team

The Residential Apartment Buildings (Compliance and Enforcement Powers) Act 2020 gave the NSW regulator strong powers over new apartment buildings. For developers, it means serious defects can delay occupation, registration and settlement. Planning for compliance early is far cheaper than fixing problems after an order.

This is general information from a builder, not legal advice. Get legal advice for your project.

Key powers

  • Expected completion notice: developers generally must notify the regulator 6 to 12 months before applying for an occupation certificate.
  • Inspections: the regulator can inspect buildings during and after construction.
  • Prohibition orders: can prevent an occupation certificate being issued or a strata plan being registered while serious defects remain.
  • Rectification orders: can require serious defects to be fixed, including after completion. See rectification orders.
  • Stop work orders: where work is unsafe or likely to cause serious defects.
Waterproofing is one of the most common serious defects.
Waterproofing is one of the most common serious defects.

What counts as a serious defect?

Broadly, defects in key building elements such as waterproofing, fire safety systems, structure and the building envelope, or defects that make the building unsafe. Waterproofing is one of the most common issues. See preventing waterproofing defects.

How developers can prepare

  1. Choose the right builder, with a strong compliance record.
  2. Get designs right, with regulated designs and declarations under the DBP Act where required. See the DBP Act duty of care.
  3. Inspect at hold points, especially waterproofing, fire stopping and facades.
  4. Keep evidence: photos, test results and certificates for every key element.
  5. Run a pre-handover inspection well before applying for occupation. See pre-handover inspections.

If an order is issued

  • Get legal advice quickly.
  • Engage engineers and builders to scope and rectify the defects.
  • Communicate with the regulator, purchasers and the owners corporation.
  • Document every step of the rectification.

How getting it right helps developers

Fewer orders and fewer defects mean on-time settlements, better reputation and buyers who trust your next project.

Rectification for developers

We work with developers and their consultants to rectify defects on Class 2 buildings, with records suitable for the regulator. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

What is the RAB Act?

The Residential Apartment Buildings (Compliance and Enforcement Powers) Act 2020 gives the NSW regulator powers to inspect apartment buildings and issue orders about serious defects.

Can the Building Commission stop an occupation certificate?

Yes. A prohibition order can prevent an occupation certificate being issued or a strata plan registered while serious defects remain.

When must a developer notify expected completion?

Generally 6 to 12 months before applying for an occupation certificate. Check the current requirements for your project.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote