Every defect found before handover is cheaper and easier to fix than one found by a buyer, an owners corporation or the regulator. A thorough pre-handover inspection gives developers time to fix problems while the site is still under their control.
This is general information from a builder, not legal advice. Get legal advice for your project.
When to inspect
- At key hold points during construction, such as waterproofing before tiling.
- A full inspection well before the occupation certificate application.
- A final check before settlement and handover to the owners corporation.

What to check
Waterproofing
Balconies, bathrooms, podiums, planters, roofs and basements, with flood tests and photos. See waterproofing details.
Facade and windows
Sealants, flashings, window installations and water testing where needed. See window leaks.
Fire safety
Penetrations, fire doors and fire-rated construction. See fire stopping.
Structure and cracking
Slab cracks, render cracks and anything that suggests movement.
Drainage
Falls, outlets, overflows and sumps. See pooling water.
Balustrades
Heights, fixings and gaps. See balustrade heights.
How to run it
- Use independent inspectors, not only the builder's own team.
- Record every item with a photo, location and responsible trade.
- Prioritise serious defects that could affect occupation.
- Track rectification and re-inspect before closing items.
- Keep all records for the owners corporation and regulator.
Who fixes the defects?
Usually the head builder under the contract. Where the builder cannot or will not, developers sometimes engage a remedial builder to complete rectification, subject to contract and legal advice. See builder insolvency.
How it helps developers
Fewer surprises at settlement, fewer disputes with buyers and the owners corporation, and a stronger reputation for future projects. See RAB Act orders.
Rectification before handover
We can inspect, scope and rectify defects before handover on Class 2 buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Why should developers inspect for defects before handover?
Defects are cheaper to fix before occupation, and serious defects can delay occupation certificates, strata registration and settlements.
What are the most common defects in new apartments?
Waterproofing, facade sealants and windows, fire stopping, drainage and cracking are among the most common.
Who should do a pre-handover inspection?
Independent inspectors and relevant consultants, working alongside the builder, give the most reliable result.