Builder insolvencies have affected many residential projects in recent years. When a builder collapses mid-project or before defects are fixed, developers and owners corporations are left with incomplete work, unclear records and anxious buyers. Here is how to approach it.
This is general information from a builder, not legal advice. Get legal advice for your project.
First steps for developers
- Get legal advice on the contract, termination rights and the administrator or liquidator.
- Secure the site: fencing, scaffold, safety and insurance.
- Collect documents: drawings, certificates, inspection records and subcontractor details.
- Record the condition: photos and a survey of what is complete, incomplete and defective.
- Talk to key consultants and certifiers about what is needed to finish and certify the work.

For owners corporations in completed buildings
- Check what insurance or warranties may apply. Home building compensation cover generally does not apply to buildings over three storeys, but other options may exist. See home building compensation insurance.
- Check the strata building bond if the building is covered. See the bond scheme.
- Consider claims against others, such as developers or designers. See DBP Act duty of care.
- Keep the defect register up to date.
Completing and rectifying the work
- Scope: a clear list of incomplete and defective work, ideally with an engineer.
- Open up where needed: hidden work may need checking if records are missing.
- Price and program: separate completion from rectification where possible.
- Compliance: for Class 2 buildings, DBP Act requirements may apply to the new work.
- Records: keep full photos and documents for buyers, the owners corporation and the regulator.
Common problems found after a collapse
- Waterproofing installed without testing or records.
- Incomplete fire stopping and services penetrations.
- Unpaid subcontractors and missing certificates.
- Temporary works left in place.
How a remedial builder helps
An experienced remedial builder can step into a messy situation, work out what is there, and fix it properly with records that stand up.
Talk to us
We help developers and owners corporations scope, complete and rectify work on Class 2 buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What happens to defects if the builder goes bust?
Options depend on the building and contracts. They may include warranties, insurance, the strata building bond or claims against others. Get legal advice.
Does home building compensation insurance cover apartment towers?
Generally not for buildings over three storeys. Other remedies may still be available.
Can another builder fix a collapsed builder's work?
Yes. A new builder can scope, complete and rectify the work, with checks on hidden work where records are missing.