The Design and Building Practitioners Act 2020 (NSW) introduced a statutory duty of care. It means people who carry out construction work owe a duty to exercise reasonable care to avoid economic loss caused by defects. For owners corporations with defects, and for developers and builders, it changed the picture significantly.
This is general information from a builder, not legal advice. Duty of care claims are complex, so get legal advice.
Who owes the duty?
Broadly, anyone who carries out construction work, which can include builders, designers, engineers, developers and people who manage or supervise the work. The courts have considered how widely this applies, so legal advice matters.

Who can rely on it?
Owners of land, including owners corporations and subsequent owners, for defects that cause them economic loss, such as the cost of rectifying defects.
Time limits
Building claims in NSW are generally subject to a 10-year long-stop limit from completion, and other limitation periods may also apply. Do not wait to get advice. See claim time limits.
What it means for owners
- More options when the original builder has gone or will not fix defects. See builder insolvency.
- The need for good evidence: reports, photos and costed rectification scopes.
- The importance of fixing defects properly, with records, so the scheme can show its loss.
What it means for developers and builders
- Defects can lead to claims years after completion.
- Quality and records during construction are the best protection.
- Cooperative rectification may avoid costly litigation. See handling defect complaints.
Related DBP Act rules
The DBP Act also requires regulated designs, declarations and registered practitioners for certain Class 2 building work. That applies to remedial work too. See the DBP Act and remedial work.
Where a builder fits in
We do not give legal advice, but we can help lawyers, engineers and owners by inspecting, opening up, scoping and costing rectification, then carrying out the works with full records.
Rectification work
We rectify defects on Class 2 buildings to engineers' designs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What is the DBP Act duty of care?
A statutory duty on those who carry out construction work to exercise reasonable care to avoid economic loss caused by defects, owed to owners including owners corporations.
Can owners corporations sue developers under the DBP Act?
The duty can extend to developers and others who carry out construction work. Get legal advice for your situation.
How long do owners have to make a building claim?
Building claims in NSW are generally subject to a 10-year long-stop limit from completion, with other time limits possible. Get advice early.