Remedial work on NSW apartment buildings is regulated under the Design and Building Practitioners Act. METCON holds DBP General Unrestricted registration (BUP4254812), so we can carry out regulated remedial building work on Class 2 buildings and make the compliance declarations your building needs.
A Class 2 building is an apartment building: two or more sole-occupancy units, one above the other or side by side, under the National Construction Code. Most strata buildings in Sydney are Class 2, including walk-ups, towers and the residential part of mixed-use buildings.
Under the Design and Building Practitioners Act 2020, building work on Class 2 buildings, including most remedial building work, must be carried out by a registered building practitioner, built to regulated designs prepared by registered design practitioners, and supported by compliance declarations lodged through the NSW Planning Portal. Some work is exempt, such as certain emergency repairs, so we confirm what applies to your job.
METCON is registered as a building practitioner with General Unrestricted registration (BUP4254812), which covers Class 2 buildings of any height. We work with your remedial engineer or registered design practitioner, build to the regulated design and handle the building compliance declaration at the end of the job.

If any of these sound familiar, it is worth a free site visit. We will tell you straight what your site needs.
Re-waterproofing balconies, podiums, roofs and planters on apartment buildings.
Slab edges, columns, beams and carpark repairs to an engineer's design.
Render, brickwork, windows, sealants and other parts of the building enclosure.
Fixing defects in newer buildings, including work under rectification orders.
Building work affecting fire-rated construction and penetrations, with your fire safety practitioners.
A remedial report or regulated design that needs a registered builder to price and deliver it.
Have a remedial report or regulated design? Send it through and we will price it line by line.
One registered builder for the whole scope, working to your engineer's design and documenting every stage for the DBP Act.
Membranes, falls, drainage, door sills, tiling and balustrades across whole buildings.
Break-out, steel treatment and reinstatement to the engineer's specification.
Podiums, roofs, planters, basements, lift pits and wet areas.
Render, brickwork, lintels, wall ties, sealants and protective coatings.
Rectifying defects in newer Class 2 buildings, including under regulator orders.
Strengthening, steel replacement and repairs with engineering design.
A selection of recent class 2 builder projects across Sydney.
View all projectsEvery Class 2 remedial project follows the same steps, from the regulated design to the building compliance declaration and handover pack.
We attend site, inspect the defect and its surroundings, and identify the cause rather than just the symptom. Where needed we take photos, moisture readings and cover measurements.
We coordinate a remedial or structural engineer where required and agree a written scope of works that fixes the cause, not only the visible damage.
You receive a clear, itemised written quote with methodology, materials, access, programme and any approvals. No vague lump sums.
Our crew carries out the work to the engineer's specification and Australian Standards, with progress photos and hold-point inspections at each critical stage.
Final inspection, clean-up and a handover pack: photos, product data, engineer sign-off where applicable, and your statutory warranty under the Home Building Act 1989.
Work built to the regulated design, hold-point photos, variation records and the building compliance declaration where required, so your owners corporation has a complete record.
Licensed builder 384697C with DBP General Unrestricted registration BUP4254812, working with strata managers, owners corporations, building managers, engineers and developers across Sydney.
We diagnose why the defect happened. Patching over the symptom is why so many repairs fail twice.
DBP General Unrestricted (BUP4254812). Qualified for Class 2 apartment remedial work under the Design and Building Practitioners Act 2020.
Builder Licence 384697C, $20M public liability, workers compensation and HBCF cover where required.
We work with remedial and structural engineers from diagnosis to sign-off, so the fix is designed, not guessed.
Photos, product data, hold-point records and certification. Exactly what strata committees, insurers and buyers ask for.
Hands-on remedial and heritage work across Sydney since the 1970s, including jobs other builders turned down.
Real reviews from homeowners, strata and builders.
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
Straight answers from the builder. Anything else, just ask.
A builder who is registered under the NSW Design and Building Practitioners Act to carry out building work on Class 2 buildings, which are apartment buildings. METCON holds General Unrestricted registration, BUP4254812.
Most remedial building work on Class 2 buildings does, including work on waterproofing, structure, the building enclosure and fire safety systems. Some work is exempt, such as certain emergency repairs. We confirm what applies before quoting.
Generally, regulated designs and design compliance declarations from a registered design practitioner, and a building compliance declaration from the registered building practitioner, lodged through the NSW Planning Portal. We work with your engineer to get these right.
Search the builder's name or registration number on the NSW Government licence and registration check. Ours are builder licence 384697C and DBP registration BUP4254812.
Yes. We price to the engineer's specification, report to the committee and strata manager, and keep residents informed throughout the works.
Remedial problems rarely come alone. Leaks cause concrete cancer, damp causes render failure. We fix the whole chain.
Back to Remedial BuildingPlain-language guides from our team on the questions we are asked most.
Apartment buildings across the Eastern Suburbs, City, Inner West, Lower North Shore, Northern Beaches and beyond.
Send us your engineer's report, regulated design or defect list, or a few photos, and we will come back with next steps.