Remedial works happen in and around people's homes, often at height, over footpaths and in occupied buildings. The right insurances protect the owners corporation, residents, the public and the builder. Committees should check them before signing.
The main insurances
- Public liability. Covers injury to people and damage to property caused by the works. Check the amount of cover suits the size and risk of the job.
- Contract works. Covers the works themselves against damage during construction, such as storm or fire. The contract says who arranges it.
- Workers compensation. Required for employees. Ask for current certificates.
- Home building compensation (HBCF). Required in NSW for residential building work over the threshold in many cases, but there are important exemptions for some multi-storey buildings. See HBCF and warranty on strata works.
Tell the building's insurer
The owners corporation's own building insurer should be told about major works. Some policies have conditions about construction activity, scaffolding or vacant areas. Your strata manager can do this.
Check before signing
- Certificates of currency for each policy, with expiry dates.
- Policy amounts suitable for the project.
- The owners corporation noted as an interested party where appropriate.
- Subcontractors' insurances managed by the head contractor.
When something goes wrong
If works cause a leak or damage to a unit, report it to the builder and strata manager immediately with photos. The builder should make safe and repair, and involve insurers if needed.
Fully insured remedial works
We provide certificates of currency before every strata project and keep them current through the works. See strata remedial works. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
This article is general information, not legal advice. Check current requirements with NSW Fair Trading, the Building Commission or a strata lawyer.
Frequently asked questions
Does the builder or the strata arrange contract works insurance?
It depends on the contract. Make sure one party clearly has it, and that it covers the full contract value.
Is HBCF always required on strata remedial works?
Not always. There are exemptions, including for some buildings over three storeys. Check with your strata manager or lawyer.
What if a resident's belongings are damaged?
Report it straight away. The builder's public liability insurance usually responds to damage caused by the works.