Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Warranties on Strata Remedial Works in NSW

18 November 2026 · 4 min read · By the METCON team

When an owners corporation pays for remedial work, it should know what protection it has if the work fails. In NSW, a few different warranties can apply.

Statutory warranties

Residential building work in NSW carries statutory warranties under the Home Building Act 1989, including that work will be done with due care and skill, in accordance with the contract and the law, with suitable materials. The warranty period is 6 years for major defects and 2 years for other defects. Remedial work on an apartment building is generally residential building work.

Home building compensation cover

Home building compensation (HBCF) insurance protects owners if the builder dies, disappears or becomes insolvent. It is not required for work on residential buildings with a rise in storeys of more than three that contain two or more dwellings. So for many larger apartment buildings, the owners corporation will not have HBCF cover on remedial work. That makes choosing a stable, licensed builder more important.

BuildingHBCF on remedial work?
Walk-up, three storeys or fewerGenerally required over the threshold
Four or more storeysGenerally not required

Check the current rules for your building.

Product and system warranties

Waterproofing membranes, coatings and repair mortars often come with manufacturer warranties, sometimes only if installed by an approved applicator. Ask for these in writing at handover.

DBP Act declarations

For regulated work on Class 2 buildings, the building practitioner must provide compliance declarations. These are not warranties, but they create accountability. See the DBP Act and remedial work.

What to ask for at handover

  • Written workmanship warranty from the builder.
  • Product warranties and data sheets.
  • Waterproofing certificates. See waterproofing certificates.
  • Photos of every hold point.
  • Engineer sign-off where applicable.
  • Compliance declarations for regulated work.

Documented, warranted remedial work

We hand over a complete pack on every strata remedial job. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Is remedial work on common property covered by statutory warranties?

Generally yes, as residential building work under the Home Building Act. Get advice on your specific contract.

Why is HBCF not required for high-rise buildings?

The Home Building Act scheme exempts residential buildings with a rise in storeys of more than three containing two or more dwellings.

How long do waterproofing warranties last?

Product warranties vary by manufacturer and system. Statutory warranties under the Home Building Act also apply.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote