Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Camperdown ยท Inner West Balcony & strata remedial builders in Camperdown.

Remedial building for Camperdown terraces, warehouse conversions and apartment buildings: leaks, brick repairs, rising damp, concrete repairs and defect rectification.

  • Free inspection in Camperdown
  • Itemised written quote
  • Class 2 and strata experience
  • Licensed builder 384697C
  • DBP registered BUP4254812
  • Photos and records for your strata
Talk directly with the builder0415 840 500

Free inspection in Camperdown

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Inspection in Camperdown
DBP
Registered for Class 2 work
$20M
Public liability insurance cover
Remedial building in Camperdown

Terraces, conversions and busy strata buildings.

Camperdown sits beside Royal Prince Alfred Hospital and the University of Sydney, with terraces, walk-up blocks, converted warehouses and newer apartment buildings.

Many properties are rented, and heavy use shows in shared areas and wet areas. Common jobs here include leaking bathrooms, damp terraces, tired flat roofs on walk-ups and old brickwork around lintels and parapets.

Common problems we fix in Camperdown

  • Bathroom leaks in rented apartments
  • Flat roof leaks on walk-ups
  • Warehouse parapet and roof repairs
  • Rising damp in terraces
  • Mould complaints in rentals
Spalled concrete and corroded steel, remediated by METCON
CamperdownInner West

Camperdown at a glance

RegionInner West
CouncilInner West Council (parts in City of Sydney)
Building classClass 2 apartments, strata and homes
InspectionFree, usually within a few days

Parts of Camperdown are heritage conservation areas. The suburb crosses a council boundary, so we check which controls apply to your building.

Remedial services in Camperdown

One builder for the whole problem.

Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.

Why METCON

Strata remedial work, done once.

We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.

You deal directly with the builder, from the first inspection in Camperdown to the final flood test and handover.

Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812
Demolition LicenceAD214430
Public Liability$20M
ServicingCamperdown and Inner West
ABN 89 151 074 421
What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from strata buildings and homeowners.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Helpful guides

Know more before you start.

Plain-language guides for owners and strata committees.

Camperdown FAQ

Remedial building in Camperdown: questions.

Straight answers from the builder. Anything else, just call.

Can you help with a mould complaint at my Camperdown rental?

Yes. We inspect the property and find whether the cause is a leak, damp or poor ventilation, then fix it and provide a written summary for your records.

Do you do balcony repairs and waterproofing in Camperdown?

Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Camperdown apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.

Are you registered for Class 2 apartment work in Camperdown?

Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.

Do remedial works in Camperdown need council approval?

Many repairs are maintenance and do not, but some works can. Parts of Camperdown are heritage conservation areas. The suburb crosses a council boundary, so we check which controls apply to your building. The council is Inner West Council. We check what applies before quoting.

How much do remedial repairs cost in Camperdown?

It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.

Nearby areas

Also servicing near Camperdown.

We work right across Inner West and the rest of Sydney. See all service areas.

Leaking balcony or concrete cancer in Camperdown?

Free inspection and a straight answer from a licensed, DBP registered Sydney builder.

Call now Free Quote