Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Lilyfield ยท Inner West Balcony & strata remedial builders in Lilyfield.

Remedial building for Lilyfield homes and apartment blocks: damp and subfloor repairs, cracked walls, brickwork, roof leaks and balcony waterproofing.

  • Free inspection in Lilyfield
  • Itemised written quote
  • Class 2 and strata experience
  • Licensed builder 384697C
  • DBP registered BUP4254812
  • Photos and records for your strata
Talk directly with the builder0415 840 500

Free inspection in Lilyfield

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Inspection in Lilyfield
DBP
Registered for Class 2 work
$20M
Public liability insurance cover
Remedial building in Lilyfield

Federation homes on sloping streets.

Lilyfield has Federation and inter-war homes, cottages and apartment blocks on hilly streets that run down towards Rozelle Bay and Hawthorne Canal.

Slopes and clay soils are common causes of cracking and damp in older homes here. Walk-up apartment blocks more often deal with original balcony waterproofing, roofs and brickwork that are reaching the end of their life.

Common problems we fix in Lilyfield

  • Cracks from clay soil movement
  • Damp subfloors on slopes
  • Failed mortar and fretting bricks
  • Walk-up balcony leaks
  • Rusted lintels over windows
Concrete cancer on a slab edge, repaired by METCON
LilyfieldInner West

Lilyfield at a glance

RegionInner West
CouncilInner West Council
Building classClass 2 apartments, strata and homes
InspectionFree, usually within a few days

Parts of Lilyfield have heritage controls, so changes to older homes may need council approval.

Remedial services in Lilyfield

One builder for the whole problem.

Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.

Why METCON

Strata remedial work, done once.

We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.

You deal directly with the builder, from the first inspection in Lilyfield to the final flood test and handover.

Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812
Demolition LicenceAD214430
Public Liability$20M
ServicingLilyfield and Inner West
ABN 89 151 074 421
What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from strata buildings and homeowners.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Helpful guides

Know more before you start.

Plain-language guides for owners and strata committees.

Lilyfield FAQ

Remedial building in Lilyfield: questions.

Straight answers from the builder. Anything else, just call.

Why do cracks in my Lilyfield home open and close with the seasons?

Clay soils swell when wet and shrink when dry, which moves footings. Seasonal cracks are common, but growing ones should be checked, and drainage is often part of the solution.

Do you do balcony repairs and waterproofing in Lilyfield?

Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Lilyfield apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.

Are you registered for Class 2 apartment work in Lilyfield?

Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.

Do remedial works in Lilyfield need council approval?

Many repairs are maintenance and do not, but some works can. Parts of Lilyfield have heritage controls, so changes to older homes may need council approval. The council is Inner West Council. We check what applies before quoting.

How much do remedial repairs cost in Lilyfield?

It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.

Nearby areas

Also servicing near Lilyfield.

We work right across Inner West and the rest of Sydney. See all service areas.

Leaking balcony or concrete cancer in Lilyfield?

Free inspection and a straight answer from a licensed, DBP registered Sydney builder.

Call now Free Quote