Balconies are among the most used, most exposed and most neglected parts of an apartment building. For a strata committee, regular balcony inspections are the simplest way to keep residents safe and avoid an emergency special levy.
What the owners corporation is responsible for
Under section 106 of the Strata Schemes Management Act 2015, the owners corporation must properly maintain and repair common property. In most NSW schemes, balcony slabs, waterproofing membranes and often balustrades are common property. Lot owners are usually responsible for tiles, fixtures and anything they have added, but this depends on the strata plan and by-laws. See who is responsible for repairs in strata.
NSW does not have a general law requiring periodic balcony inspections in existing apartment buildings. That makes it the committee's job to know what condition the balconies are in.

What a balcony inspection checks
- Concrete: slab edges, soffits and upstands for cracking, rust staining, drummy areas and spalling.
- Balustrades: height, gaps, climbable elements, corrosion, loose fixings and cracked concrete at posts.
- Waterproofing: drummy or cracked tiles, grout and sealant condition, thresholds, drains, overflows and signs of leaks below.
- Drainage: falls, ponding, blocked outlets and downpipes.
- Structure: sagging, deflection or movement, especially on cantilevered balconies.
- Timber elements: rot, borer and corroded fixings on timber balconies.
- Loads and alterations: heavy planters, spas, enclosures or unapproved changes.
How often should balconies be inspected?
- Every year: a walk-around visual check, ideally with the building manager.
- Every 3 to 5 years: a detailed inspection of every balcony, including sounding tiles and concrete, by a remedial builder or engineer.
- Straight away: after a leak report, falling concrete, a loose balustrade or a severe storm.
Older buildings, coastal buildings and buildings with a history of leaks need closer attention.
Turning the report into a plan
- Make anything unsafe safe, such as loose balustrades or falling concrete.
- Rank the rest by urgency: safety, active leaks, then deterioration.
- Get a scope of works from an engineer or remedial consultant for larger repairs.
- Budget in the capital works fund. The 10-year plan should include balcony waterproofing, concrete and balustrade replacement. See building condition reports.
- Group the work into one program, because doing all balconies together is cheaper than one at a time.
Communicating with owners
Owners are more willing to fund balcony repairs when they see clear photos and a simple explanation. A good inspection report shows each balcony, the problem, the risk and the recommended fix. Avoiding an emergency special levy is the strongest argument for regular inspections.
Balcony inspections and repairs for strata
We inspect, report on and repair balconies across Sydney strata buildings. We are DBP registered for Class 2 work and work with your engineer, strata manager and residents. See our strata remedial service or call 0415 840 500.
Frequently asked questions
Are balcony inspections mandatory in NSW strata?
There is no general law requiring periodic balcony inspections in existing NSW apartment buildings, but the owners corporation must maintain and repair common property under the Strata Schemes Management Act 2015.
How often should strata balconies be inspected?
A visual check every year and a detailed inspection every 3 to 5 years, or straight away after a leak, falling concrete or a loose balustrade.
Who pays for balcony repairs in strata?
Usually the owners corporation, for common property like slabs, membranes and balustrades. Tiles and owner additions depend on the strata plan and by-laws.


