A building health check, or condition report, gives an owners corporation a clear picture of its building before small defects become big bills. It is one of the best investments a strata committee can make.
What a building health check covers
- Roofs, gutters, box gutters and drainage.
- Facades: render, brickwork, cladding, sealants and windows.
- Balconies: waterproofing, slab edges, balustrades and tiles.
- Concrete: cracking, spalling and concrete cancer.
- Basements and carparks: leaks, joints and drainage.
- Common areas, stairs and paths.
- Safety items that need urgent attention.
The capital works fund link
NSW owners corporations must keep a capital works fund and a 10-year plan for major repairs and replacements, reviewed regularly. A condition report gives that plan real numbers instead of guesses, and helps avoid sudden special levies. See special levies for remedial works.
How to prioritise what the report finds
- Safety: falling concrete, loose balustrades, trip hazards.
- Water getting in: roofs, balconies and facades.
- Structure and durability: concrete cancer and corrosion.
- Compliance: fire safety and access items.
- Cosmetic: once the causes are fixed.
Turning the report into a program
- Group related work so access, such as scaffolding, is only paid for once.
- Get an engineer's specification for major items.
- Get itemised quotes that price the same scope.
- Stage the work to match the capital works fund.
How often?
Many buildings benefit from a condition review every few years, and after major storms. Older buildings and coastal buildings deteriorate faster.
Class 2 remedial works
METCON is DBP registered for Class 2 apartment buildings and turns condition reports into itemised, staged programs. See our strata remedial service.
Frequently asked questions
What is a strata building health check?
An inspection of a strata building's roofs, facades, balconies, concrete, basements and common areas, with a report on defects and priorities.
Is a capital works fund plan required in NSW?
Yes. Owners corporations must keep a capital works fund with a 10-year plan for major repairs and replacements.
How often should a strata building be inspected?
Many buildings benefit from a review every few years and after major storms, more often for older or coastal buildings.


