Balconies are among the most common and most expensive repair items in Sydney apartment buildings. They sit outside in the weather, carry people and furniture, and protect the apartments below. When they fail, owners deal with leaks, concrete cancer and safety risks all at once. This guide brings the whole process together.
1. Know the warning signs
- Leaks or stains in the ceiling below. See balcony soffit repairs.
- Water pooling, drummy or cracked tiles. See pooling water.
- Rust stains, cracks or spalling on slab edges. See slab edge repairs.
- Loose or rusted balustrades. See balustrades.
More in signs of balcony failure.

2. Inspect the whole building
One leaking balcony often means others share the same detail. A balcony condition survey shows the pattern and the priorities.
3. Choose the repair approach
- Targeted repairs: drains, door sills or one slab edge. See drain repairs.
- Coatings: only where tiles and falls are sound. See coatings.
- Full re-waterproofing: strip, repair, new membrane, flood test, new tiles. See how to waterproof a balcony.
4. Approvals and compliance
Most balcony waterproofing and slabs are common property, so works generally need owners corporation approval. On Class 2 buildings, the DBP Act may require regulated designs, declarations and a registered practitioner. See the DBP Act and remedial work.
5. Funding
Plan through the capital works fund, levies or loans. See capital works planning and funding options.
6. Delivery
Stage by stack, protect residents and keep them informed. See building-wide programs and repairs in occupied apartments.
7. Records and maintenance
Keep photos, flood tests and warranties, and keep drains clear. See flood testing and warranties.
How balcony remediation helps your building
Repaired balconies stop leaks and concrete damage, make balconies safe to use and protect values across the building.
Strata balcony repairs
We inspect, repair and re-waterproof balconies on apartment buildings across Sydney. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What does balcony remediation involve?
Usually stripping tiles and screed, repairing the concrete, installing a new membrane with proper drains and door details, flood testing, then re-tiling.
Who pays for balcony repairs in strata?
Balcony waterproofing and slabs are usually common property, so the owners corporation generally pays. Check your strata plan and by-laws.
Should all balconies be repaired at once?
Not always. A survey shows which are failing. Staging can work, but doing similar balconies together often saves on access.


