Every NSW strata scheme must have a 10-year capital works fund plan, and it must be reviewed at least every five years. In many buildings, the plan was written once and forgotten. Then a balcony fails, concrete cancer appears or the roof starts leaking, and owners are hit with a special levy nobody saw coming.
What the capital works fund plan is for
The plan estimates the major repairs and replacements the building will need over the next 10 years, and the levies needed to pay for them. It covers common property: roofs, facades, balconies, waterproofing, windows, car parks, lifts and services.
A good plan spreads the cost of big remedial items across years of levies. A poor one leaves the fund short when the work is due.

Remedial items that are often missing or underestimated
- Balcony re-waterproofing. Membranes have a finite life, and many older buildings are on their originals. See balcony repair costs.
- Concrete cancer repairs to slab edges, soffits and car parks, which grow every year they are left.
- Roof and gutter replacement, including box gutters and flashings.
- Facade work: render repairs, sealants and repainting.
- Scaffold and access, which can be a large part of any facade or balcony project.
- Engineering, testing and DBP compliance for Class 2 buildings.
How to build remedial work into the plan
- Get a condition report. A building condition report or remedial engineer's inspection shows what is failing now and what will need work soon.
- Price it realistically. Ask for budget estimates from a remedial builder, not just a generic allowance per square metre.
- Group work around scaffold. Facade, balcony and window work done together shares access costs.
- Stage the big items. If the fund cannot cover everything at once, plan stages by priority, with safety items first.
- Review it. Update the plan after any major inspection, not just every five years.
Why early remedial work is cheaper
Concrete cancer, leaks and cracking get worse every year. A slab edge that needs a small patch today can need a full rebuild in five years. Funding early repairs through the capital works plan usually costs owners less in total than waiting for failure. See the cost of delaying remedial repairs.
When a special levy is still needed
Sometimes the work is too big or too urgent for the fund. That is when a well-documented engineer's report and clear pricing help owners vote for a levy. Our guide on getting owners to approve remedial works covers how to present it.
Budget pricing for your plan
We provide inspection-based budget pricing for strata capital works plans, covering balconies, waterproofing, concrete cancer and facades. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Is a capital works fund plan compulsory in NSW?
Yes. NSW strata schemes must have a 10-year capital works fund plan and review it at least once every five years.
Should remedial work be in the capital works plan?
Yes. Balcony waterproofing, concrete cancer, roofs and facades are major common property costs and should be planned and funded over time.
How do we get realistic costs for the plan?
Start with a condition report or engineer inspection, then ask a remedial builder for budget estimates based on what was found.