When a leak appears under one balcony, the same detail is often failing on others. A balcony condition survey looks at every balcony, or a representative sample, so the owners corporation can see the full picture before spending money.
What is checked
- Tiles: drummy, cracked or loose areas, found by tapping.
- Falls and ponding after rain or a hose test.
- Drains, overflows and door sills.
- Slab edges and soffits for cracks, rust and spalling.
- Balustrades and fixings.
- Signs of leaks in the apartment below.
- Owner additions such as screens, planters and air conditioners.

Testing
Depending on what is found, testing can include cover meters, carbonation and chloride tests on concrete, and water testing of drains or sills. See concrete testing and leak detection.
How results are presented
- A schedule of every balcony with photos.
- A rating such as urgent, within 12 months, or monitor.
- Likely repair type for each.
- Indicative staging for the building.
Access to apartments
Surveys need access to each balcony. Give owners and tenants plenty of notice. See access to apartments.
Using the survey
- Fix urgent safety items straight away.
- Build a scope and get comparable quotes. See scope of works.
- Update the capital works fund plan.
- Share with owners so they understand the decision.
How a survey helps
It turns scattered complaints into a clear plan, avoids surprise costs and helps owners vote with confidence.
Balcony surveys
We inspect balconies across apartment buildings and give committees a clear, photo-based report. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What is a balcony condition survey?
An inspection of the balconies on a building, recording tiles, falls, drains, slab edges, balustrades and leaks, with priorities for repair.
Do all balconies need to be inspected?
Ideally yes, or a representative sample where balconies are identical. Leaking stacks should always be checked.
How often should balconies be surveyed?
As part of a building condition report every few years, and sooner if leaks or concrete damage appear.


