Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

What Goes in a Remedial Scope of Works for Strata?

4 November 2026 · 4 min read · By the METCON team

When owners corporations get remedial tenders that are miles apart in price, the cause is usually the same: a vague scope. Each builder priced something different. A well-written scope of works gives everyone the same job to price, and keeps variations under control once work starts.

Who writes it

For anything beyond a simple repair, the scope is usually prepared by a remedial engineer or building consultant, based on their inspection and testing. For Class 2 buildings, it is tied to the regulated designs under the DBP Act.

Concrete broken out to measure the real extent of repairs.
Concrete broken out to measure the real extent of repairs.

What a good scope includes

1. Description and drawings

Which balconies, elevations or areas are included, with drawings or marked-up photos.

2. Specifications

How the work must be done: membrane system and details, concrete repair method and materials, tile and adhesive types, balustrade fixing, sealants and coatings.

3. Quantities and rates

Concrete cancer is hidden until the concrete is opened, so good scopes use estimated quantities with unit rates (per square metre or per linear metre) for concrete repairs. This keeps pricing fair when the real quantity turns out different.

4. Provisional sums

Allowances for items that cannot be known in advance, such as hidden damage under tiles. They should be clearly marked as provisional.

5. Access and site set-up

Scaffold, swing stages or other access, hoarding, council permits, site facilities and protection of common areas.

6. Testing and hold points

Engineer inspections at key stages, such as after concrete break-out, and flood tests of new membranes before tiling.

7. Residents and programme

Work hours, notices, staging by stack or elevation, and access to units.

8. Documents and handover

Compliance declarations, waterproofing certificates, warranties, test results and as-built photos.

Common gaps that cause variations

  • No allowance for hidden concrete damage.
  • Door thresholds and balustrades left out of a balcony scope. See door thresholds.
  • Making good inside units not mentioned.
  • Drainage outlets and overflows not specified.
  • Unclear tile selection or matching requirements.

No engineer yet?

For smaller jobs, we can inspect and prepare an itemised scope and quote, and bring in an engineer where the work needs one. For bigger projects, we price your engineer's scope as written. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Why are our remedial tenders so different in price?

Usually because the scope was vague and each builder priced something different. A detailed scope with specifications, quantities and rates makes tenders comparable.

How do you price concrete cancer when you cannot see it?

Good scopes use estimated quantities and unit rates, so the final cost reflects the actual area repaired.

Who prepares a remedial scope of works?

Usually a remedial engineer or building consultant after inspection and testing. For small jobs, a remedial builder can prepare an itemised scope.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote