A balcony leaking into the room below usually shows up as ceiling stains, bubbling paint, drips at the window head or mould along the wall. The balcony looks fine from above, because the failure is under the tiles or at the edges.
Where balcony leaks usually start
- Door thresholds: membranes not turned up under the sliding door sill.
- Wall junctions: membrane upturns too low or cracked at the corners.
- Floor wastes: no puddle flange, or a cracked connection.
- Balustrade posts drilled through the membrane without sealing.
- Slab edges: water tracking along the underside of the slab into the wall below.
- Failed membrane across the whole balcony.

How balcony leaks are detected
- Visual inspection above and below, matching stains to likely sources.
- Moisture readings on walls, ceilings and the slab.
- Flood testing: sections of the balcony are dammed and flooded one at a time, to see which area leaks.
- Water testing doors and windows separately, so a window leak is not blamed on the balcony.
- Opening up a few tiles where needed to see the membrane.
Repair options
- Local repairs at a threshold, drain or post, where testing proves the rest is sound.
- Full re-waterproofing: remove tiles and bed, repair the slab, new membrane with proper upturns and puddle flanges, then re-tile. See balcony waterproofing standards.
- Concrete repairs where water has caused concrete cancer.
- Making good below: ceilings, walls and finishes once the leak is stopped.
Who is responsible in strata?
Balcony waterproofing is usually common property in NSW strata schemes, so the owners corporation is generally responsible. See who is responsible for repairs in strata.
Balcony leak repairs in Sydney
We trace the leak before we quote, so you only pay for the repair that fixes it. See our balcony repair service or call 0415 840 500.
Frequently asked questions
How do you find where a balcony is leaking?
By inspecting above and below, taking moisture readings, flood testing sections of the balcony one at a time, and testing doors and windows separately.
Can a leaking balcony be fixed without removing tiles?
Sometimes, if testing proves the leak is at one detail such as a drain or threshold. A failed membrane usually needs the tiles removed.
Who fixes a balcony leaking into the unit below?
In most NSW strata schemes, balcony waterproofing is common property, so the owners corporation is generally responsible.


