Balcony repairs in apartment buildings usually happen with residents at home. Knowing what to expect makes the process much easier for everyone.
Before works
- Notice of dates and what is needed from you.
- Clear the balcony of furniture, pots, BBQs and screens.
- Arrange access if you won't be home. See access to apartments.
- Tell the site team about pets, alarms or medical needs.

During works
- Noise: tile and screed removal is noisy, usually for a few days per balcony.
- Dust: doors are sealed and protected, and dust is controlled.
- No balcony use: while membranes cure and tests run.
- Door access: balcony doors may be locked or sealed for periods.
- Work hours: usually standard building hours.
Typical sequence
- Strip tiles and screed.
- Repair concrete.
- Install membrane and details.
- Flood test. See flood testing.
- Screed and tile.
- Reinstall balustrades and fixtures.
See how long works take.
Protecting your apartment
Floors inside near the door are covered, and the team should leave the area clean each day. Report any damage straight away.
If you rent
Talk to your agent. See landlords and remedial works.
How it helps you
A few weeks of disruption gives you a dry apartment, a safe balcony and a building that holds its value.
Considerate balcony repairs
We plan works around residents and keep everyone informed. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Can I stay in my apartment during balcony repairs?
Usually, yes. Expect noise, dust control and no balcony use for a period.
How long will I lose use of my balcony?
It varies with the work, membrane curing and testing. Your builder should give you a schedule.
Do I need to be home for balcony works?
Not always. Access can often be arranged with keys and the building manager.


