Building Commission NSW Rectification Orders Explained

2 November 2026 · 4 min read · By the METCON team

NSW has one of Australia's strongest regulatory regimes for apartment building defects. Building Commission NSW can investigate residential apartment buildings and order developers to fix serious defects. For owners corporations dealing with a defective new building, it is important to understand how these powers work.

The law behind it

The Residential Apartment Buildings (Compliance and Enforcement Powers) Act 2020 gives the regulator powers over residential apartment buildings, which are generally Class 2 buildings. Building Commission NSW administers these powers.

A balcony opened up to inspect a failed membrane.
A balcony opened up to inspect a failed membrane.

The main types of orders

Building work rectification orders

These can require a developer to fix serious defects in a residential apartment building. The orders generally apply to buildings completed within the previous 10 years, and can be issued even after the building is occupied.

Prohibition orders

These can stop an occupation certificate being issued, or a building being registered as a strata plan, where serious defects exist or the building is not ready.

Stop work orders

These can stop building work that is likely to result in significant harm or a serious defect.

What is a serious defect?

In general terms, a serious defect is a defect in a building element, such as waterproofing, structure, the building enclosure or fire safety systems, that is likely to make the building or part of it unusable, cause it to collapse or be destroyed, or threaten safety. Failed balcony and podium waterproofing is one of the most common types raised. See waterproofing defects in new apartments.

How owners corporations can use these powers

  1. Get an independent defect report from a building consultant. See what to do after a defect report.
  2. Report serious defects to Building Commission NSW with evidence: photos, reports and dates.
  3. Keep pursuing your other rights in parallel, such as statutory warranties and the strata building bond, because a regulator investigation is not a substitute for your own claims.
  4. Get legal advice on how the options fit together and on time limits.

Rectification work after an order

When a rectification order is issued, the developer usually engages builders to do the work to an approved scope. In other cases owners corporations engage their own builder after a settlement or claim. Either way, the rectification should follow a proper engineered design and be documented, because it will be inspected.

Rectification you can rely on

We rectify waterproofing, structural and façade defects in Class 2 buildings to engineer and consultant specifications, with full documentation for regulators, consultants and owners. See our defect rectification service or call 0415 840 500.

Frequently asked questions

Can Building Commission NSW make a developer fix defects?

Yes. It can issue building work rectification orders requiring developers to fix serious defects in residential apartment buildings, generally within 10 years of completion.

What counts as a serious defect?

Generally a defect in a building element such as waterproofing, structure, the enclosure or fire safety systems that could make the building unusable, cause collapse or threaten safety.

Should owners still pursue their own claims?

Yes. Regulator action does not replace statutory warranty claims, the strata bond or legal action. Get legal advice on time limits.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote