Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500

Pagewood ยท Eastern Suburbs Balcony & strata remedial builders in Pagewood.

Remedial building for Pagewood apartment buildings and strata schemes: waterproofing defects, balcony and podium repairs, car park leaks and defect rectification.

  • Free inspection in Pagewood
  • Itemised written quote
  • Class 2 and strata experience
  • Licensed builder 384697C
  • DBP registered BUP4254812
  • Photos and records for your strata
Talk directly with the builder0415 840 500

Free inspection in Pagewood

Builder calls you back

No obligation. We never share your details.
40+
Years building across Sydney
$0
Inspection in Pagewood
DBP
Registered for Class 2 work
$20M
Public liability insurance cover
Remedial building in Pagewood

New apartment buildings, new kinds of defects.

Pagewood has changed quickly, with large newer apartment developments near Eastgardens alongside older houses and walk-up blocks.

Big new buildings mean big shared areas: podiums over car parks, communal gardens, planters and many balconies. Waterproofing defects in these areas are common in newer Class 2 buildings, and acting within warranty periods can make a big difference to who pays.

Common problems we fix in Pagewood

  • Waterproofing defects in newer apartments
  • Podium and garden leaks into car parks
  • Leaking planter boxes
  • Balcony membrane and drainage defects
  • Cracked render and sealant failures
Spalled slab soffit before remedial repairs by METCON
PagewoodEastern Suburbs

Pagewood at a glance

RegionEastern Suburbs
CouncilBayside Council
Building classClass 2 apartments, strata and homes
InspectionFree, usually within a few days

Most Pagewood apartment buildings are not heritage listed. Council approval may still be needed for some external works.

Remedial services in Pagewood

One builder for the whole problem.

Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.

Why METCON

Strata remedial work, done once.

We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.

You deal directly with the builder, from the first inspection in Pagewood to the final flood test and handover.

Principal Contractor
Meteora Constructions Pty Ltd
Builder Licence384697C
DBP RegistrationBUP4254812
Demolition LicenceAD214430
Public Liability$20M
ServicingPagewood and Eastern Suburbs
ABN 89 151 074 421
What our clients say

Rated 5.0 by Sydney clients.

5.0

Real reviews from strata buildings and homeowners.

I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
JJodi Cremorne
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
JJames Cremorne
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
SBSteven Brown Vaucluse
Helpful guides

Know more before you start.

Plain-language guides for owners and strata committees.

Pagewood FAQ

Remedial building in Pagewood: questions.

Straight answers from the builder. Anything else, just call.

Can you rectify defects in a new Pagewood apartment building?

Yes. We are DBP registered for Class 2 work. We work from the defect report or engineer's design, prepare the compliance documents and fix the defects properly.

Do you do balcony repairs and waterproofing in Pagewood?

Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Pagewood apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.

Are you registered for Class 2 apartment work in Pagewood?

Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.

Do remedial works in Pagewood need council approval?

Many repairs are maintenance and do not, but some works can. Most Pagewood apartment buildings are not heritage listed. Council approval may still be needed for some external works. The council is Bayside Council. We check what applies before quoting.

How much do remedial repairs cost in Pagewood?

It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.

Nearby areas

Also servicing near Pagewood.

We work right across Eastern Suburbs and the rest of Sydney. See all service areas.

Leaking balcony or concrete cancer in Pagewood?

Free inspection and a straight answer from a licensed, DBP registered Sydney builder.

Call now Free Quote