Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Post-Tensioned Slabs in Apartment Buildings: Drill With Care

20 November 2026 · 4 min read · By the METCON team

Many apartment buildings in Sydney, especially those built since the 1980s, have post-tensioned concrete slabs. Steel tendons run through the slab, stretched under very high tension. They let slabs span further and be thinner. They also mean that drilling or cutting into the slab without care can be dangerous and very costly.

Why tendons matter

  • A cut tendon can release suddenly with great force.
  • The slab loses part of its strength where the tendon is cut.
  • Repairs need an engineer and specialist contractors.

Who drills into slabs?

More people than you would think:

  • Plumbers coring for new waste pipes in bathroom renovations.
  • Electricians running cables for EV chargers or new lights.
  • Air conditioning installers.
  • Owners fixing heavy items, screens or balustrades.
  • Remedial builders breaking out concrete cancer.

Scan first, every time

Ground penetrating radar or similar scanning shows the location of tendons and reinforcement before any core or fixing. It should be marked on the slab, both sides if possible. See EV charger works.

Rules for owners corporations

  1. Find out if the slabs are post-tensioned, from the structural drawings or an engineer.
  2. Make a by-law or policy: no coring or drilling into slabs without approval and scanning.
  3. Tell owners and their trades before renovations.
  4. Keep the drawings where trades can see them.
  5. Concrete repairs on post-tensioned slabs

    Concrete cancer repairs and slab edge repairs on post-tensioned slabs need extra care. The engineer specifies how deep to break out and how to protect tendons and anchorages. Corrosion at tendon anchorages, often at slab edges, needs specialist attention. See slab edge repairs.

    Remedial work on post-tensioned buildings

    We scan before every core and break-out, and work to the engineer's requirements on post-tensioned slabs. See concrete repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.

    Frequently asked questions

    How do I know if my building has post-tensioned slabs?

    The structural drawings show it. Signs include tendon anchorage pockets at slab edges. An engineer can confirm.

    Can I drill a small hole for a picture hook?

    Shallow fixings into walls are usually fine. Drilling into the underside or top of a post-tensioned slab should be scanned first.

    What happens if a tendon is cut?

    Stop work, keep people clear and call the engineer. Repairs are specialised.

    Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote