More apartment owners want to charge an electric car at home. In NSW, owners corporations are working out how to provide charging in shared car parks. The electrical design and installation is done by licensed electricians. But there is also building work, and getting it wrong can damage the structure or the fire separation.
The building work involved
- Core drilling through walls and slabs for cable routes.
- Fire sealing every penetration through a fire-rated wall or slab.
- Fixing cable trays and conduits to concrete.
- Bollards or wheel stops to protect chargers.
- Making good finishes, and sometimes waterproofing where cables pass through a podium.
Scan before you drill
Many apartment car park slabs are post-tensioned. Cutting a tendon is dangerous and expensive. Even in conventional slabs, cutting reinforcement weakens the slab. Every core and fixing location should be scanned first, and the engineer consulted where needed. See post-tensioned slabs.
Fire separation
Car parks are often separated from the rest of the building by fire-rated construction. Every hole through that construction must be sealed with a tested fire stopping system. Unsealed penetrations are one of the most common fire safety defects. See fire stopping defects.
Plan for the building, not one space
- A building-wide plan avoids each owner drilling their own route.
- Shared cable trays and risers mean fewer penetrations.
- By-laws should set out approvals, who pays and who maintains.
- Check the building's electrical capacity with an electrical engineer.
Older car parks
Before drilling into an older car park, check the concrete. Concrete cancer or water leaks should be dealt with first. See car park concrete repairs.
Building works for EV charging
We carry out the building works for EV charging in apartment car parks, including scanning, coring, fire sealing and making good, alongside your electrician. See concrete repairs. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book an inspection.
Frequently asked questions
Can an owner install their own charger?
Usually only with owners corporation approval, often under a by-law. Common property cabling and penetrations need approval.
Who does the electrical work?
Licensed electricians design and install the electrical system. The building work around it is done by a builder.
Is scanning really needed for every hole?
Yes, in apartment buildings. It is cheap compared to cutting a tendon or reinforcement.