Fire Stopping Defects in Apartment Buildings: A Strata Guide

4 November 2026 · 4 min read · By the METCON team

Apartment buildings are divided into fire compartments, so that a fire in one unit does not spread quickly to the next. Those walls and floors only work if every hole cut through them, for pipes, cables or ducts, is properly sealed. This is called fire stopping, and problems with it are a common defect in Class 2 buildings.

What goes wrong

  • Unsealed penetrations: holes for services left open or stuffed with non-rated material.
  • Wrong products or methods: general sealant or foam used where a tested fire-rated system was needed.
  • Later work: trades add cables or pipes after the original sealing, and leave gaps.
  • Risers and ceilings: gaps hidden in service shafts and above ceilings.
  • Fire doors: damaged doors, poor seals, hardware changes or doors that do not close properly.
Wall works in a corridor, where fire-rated construction must be maintained.
Wall works in a corridor, where fire-rated construction must be maintained.

Where they are found

  • Service risers and cupboards.
  • Between apartments and corridors.
  • Basement and car park ceilings below apartments.
  • At the junctions between walls and slabs, and at the facade.

Why remedial works matter

Remedial projects can both uncover and cause fire stopping problems. Opening up a ceiling or wall often reveals gaps. And new repairs and services must not breach existing fire-rated construction. For larger works, the scope should consider this from the beginning.

Who is responsible?

Most fire-rated walls and floors are common property, so owners corporations usually need to act, and the building must have an annual fire safety statement. Essential fire safety measures must be assessed by appropriately qualified people. Some apartment owners' renovations can also cause problems, so by-laws and approvals matter. See bathroom renovation by-laws.

How it gets fixed

  1. Survey: a qualified fire safety practitioner inspects and records defects.
  2. Scope: a schedule of what needs fixing, with tested systems for each penetration.
  3. Repair: installers seal gaps and repair walls using suitable products, following the manufacturer's tested details.
  4. Records: photos before closing up, and certificates from the relevant installers and practitioners.

What about the DBP Act?

Fire safety systems are one of the building elements covered under the Design and Building Practitioners Act, which may apply to some Class 2 building work. See the DBP Act and remedial work and Building Commission orders.

How fixing it helps your building

Fire stopping protects lives first of all. It can also support insurance, sales and compliance, and it is much cheaper to fix when ceilings and walls are already open.

How we can help

We rectify defects on Class 2 buildings and coordinate with fire safety practitioners and certified installers, so repairs are correct and well documented. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

What is fire stopping?

It is the sealing of gaps and penetrations in fire-rated walls and floors with tested systems, to help stop fire and smoke spreading between parts of a building.

Who is responsible for fire stopping in apartments?

Usually the owners corporation, since most fire-rated walls and floors are common property. Owners who cut through them in renovations can also be responsible.

Can a builder certify fire stopping?

Certification is generally done by qualified fire safety practitioners or installers for the relevant system, with the builder coordinating the work.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Council Approvals
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote