Bathroom renovations are one of the most common causes of leaks into apartments below. That is why strata schemes care so much about how they are done, and why owners usually need approval before starting.
General information only. Check with your strata manager about the approvals your scheme requires.
Why strata cares about your bathroom
- The floor slab and often the waterproofing are common property, or affect it.
- A failed membrane leaks into the unit below, damaging another owner's property and common property.
- Penetrations for new drains or plumbing go through the slab.

What approval may be needed
NSW strata law separates cosmetic work, minor renovations and more significant work. Bathroom work that involves waterproofing or changes to common property is generally treated as more than cosmetic, and may need owners corporation approval, often through a special resolution and a by-law. Your strata manager can confirm what your scheme needs.
Applications usually include:
- Plans and a description of the work.
- Details of the licensed builder and waterproofer, and their insurance.
- The waterproofing system and method.
- Work hours, access and protection of common areas.
Getting the waterproofing right
- Use a licensed contractor for the work.
- Install the membrane to the current standard, with correct upturns at walls and hobs, bond breakers at junctions and puddle flanges at drains.
- Flood test before tiling where practical.
- Get a waterproofing certificate and keep it.
See our guide to bathroom waterproofing for the details.
Protecting the unit below
A good by-law makes the renovating owner responsible for any damage caused and for maintaining the new work. Owners below should report any staining quickly. See water leaking from the apartment above.
Already leaking?
If a bathroom above is leaking, see our guide to leaking shower repairs. Fixing the cause early prevents damage to slabs and ceilings.
Bathroom waterproofing in apartments
We carry out bathroom and wet area waterproofing in apartments, with documentation for your strata approval. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
Do I need strata approval to renovate my bathroom?
Often, yes, especially if the work involves waterproofing, plumbing through the slab or changes to common property. Check with your strata manager.
Who pays if my new bathroom leaks into the unit below?
Usually the owner who did the renovation, especially where a by-law makes them responsible. Get the waterproofing right and keep the certificate.
What does strata need to see for a bathroom renovation?
Typically plans, the builder and waterproofer details and insurance, the waterproofing system, and work hours and access arrangements.


