Engineer's Report or Builder's Report for Strata Remedial Work?

19 November 2026 · 4 min read · By the METCON team

Committees often ask whether they need a remedial engineer, a builder, or both. The answer depends on the problem, the building and what the report is for.

What each brings

Remedial engineerRemedial builder
DiagnosisStructural analysis, testing and designPractical diagnosis from repairing defects every week
OutputReport, specification and drawingsReport, scope and fixed-price quote
Cost certaintyEstimatesA fixed price the builder will stand behind
Sign-offCertifies design and structural workBuilds and certifies workmanship

When you need an engineer

  • Structural repairs to slabs, beams, columns and balconies.
  • Concrete cancer across a building.
  • Retaining walls and underpinning.
  • Regulated design under the Design and Building Practitioners Act for Class 2 buildings.
  • Large projects going to formal tender.

When a builder's report and quote may be enough

  • Like-for-like repairs, such as retiling or resealing.
  • Finding the source of a leak.
  • Maintenance items and small defects.
  • Getting the cost of a known problem for budgeting, or for the two quotes rule. See the two quotes rule.

Reports for defect claims

For claims against a developer or builder, the report must be written as expert evidence and the costing must hold up. A builder who rectifies defects can give the scope and a fixed price, and an engineer adds structural opinions where needed. See strata defect claims.

Working together

On many projects the best result is both: the engineer diagnoses and designs, the builder advises on buildability and prices it, and the engineer inspects the work.

Strata reports and quotes

We prepare strata defect reports and fixed-price quotes, and work with your engineer. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or request a report or quote. Report fees are fixed and agreed in writing before we start.

Frequently asked questions

Is a builder's quote enough for the AGM?

For straightforward repairs, often yes. For structural or large projects, owners usually want the engineer's recommendation too.

Can the builder engage the engineer?

Yes, in a design and construct approach. Some committees prefer to engage the engineer directly for independence.

Do we need a DBP registered engineer?

For regulated design on Class 2 buildings under the DBP Act, yes. Ask before engaging.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote