For larger contracts, NSW strata law generally requires the owners corporation to get at least two quotes, and to put them to a general meeting. The threshold in the regulations is currently $30,000. Check the current figure and requirements with your strata manager before relying on it.
This is general information from a builder, not legal advice. Your strata manager or lawyer can advise on your scheme.
Why comparable quotes matter
Two quotes only help if they price the same work. On remedial jobs, builders often see different problems, assume different repair methods or leave out access and hidden damage. Then the cheaper quote may simply cover less.

How to get comparable quotes
- Start with a scope. An engineer or consultant's specification is best for larger works. See scope of works.
- Use the same quote form. Ask every builder to price the same items in the same order.
- Ask for rates. Concrete repairs, membrane replacement and other hidden items priced per unit.
- Ask for a program. Duration affects scaffold costs and how long residents live with the works.
- Ask about exclusions. Permits, scaffold, tiling, balustrades and finishes.
Presenting quotes at the meeting
- A one-page summary comparing price, inclusions, program and warranties.
- Photos showing why the work is needed.
- A clear motion, including funding. See AGM motions for remedial works.
- Any conflicts of interest declared.
Price isn't the only factor
For remedial work, experience, records and a realistic program often matter more than the lowest number. See engineer-led vs design and construct and the tender process.
What if urgent work is needed?
Emergency make-safe work can usually proceed quickly to protect people and property. The full repair can then be quoted properly. See strata leak emergencies.
How it helps your scheme
Clear, comparable quotes make decisions faster, reduce disputes between owners and help the committee show it acted properly.
Need a quote for your scheme?
We provide itemised quotes in the format your strata manager needs, with rates for hidden work. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
How many quotes does a NSW strata scheme need?
For contracts above the threshold in the regulations, currently $30,000, the owners corporation generally needs at least two quotes put to a general meeting. Check with your strata manager.
Why are strata remedial quotes so different?
Builders often assume different scopes and repair methods. A clear scope and standard quote form make quotes easier to compare.
Can emergency repairs go ahead before quotes?
Make-safe work to protect people and property can usually proceed quickly. The permanent repair should then be quoted properly.

