Owners corporations usually procure remedial work in one of two ways. In the engineer-led approach, the strata engages its own engineer to investigate, design and supervise, and builders tender on that design. In design and construct (D&C), one contractor provides both the design (through their engineer) and the building work.
Engineer-led (traditional)
How it works
- The strata engages an independent remedial engineer.
- The engineer investigates and prepares a scope and specification.
- Builders tender on the same scope.
- The engineer inspects during the works and signs off.
Advantages
- Independent advice, working for the owners.
- Comparable tenders on the same scope.
- An independent check on the builder's work.
Disadvantages
- Engineer's fees on top of the building cost.
- Usually a longer lead time before work starts.
- Design problems can lead to variations between engineer and builder.

Design and construct
How it works
The contractor inspects, engages an engineer to design the repair, and builds it under one contract.
Advantages
- One point of responsibility for design and construction.
- Faster start, especially on smaller or urgent jobs.
- Builder's practical input shapes the design.
Disadvantages
- Less independent oversight, unless the strata adds its own reviewer.
- Harder to compare prices between contractors with different designs.
Which suits your building?
- Large, complex or high-value projects: engineer-led usually suits, for independence and comparable pricing.
- Smaller, well-understood repairs: D&C can be faster and simpler, for example one or two balconies.
- Urgent make-safe and repair: D&C gets work moving quickly.
- Defect disputes: independent engineering is usually needed for evidence.
A middle path is also common: D&C, with the strata engaging its own engineer to review the design and inspect key stages.
Class 2 buildings
Either way, work on building elements in a Class 2 building needs regulated designs by a registered design practitioner and a registered builder under the DBP Act.
We work both ways
We price engineer-led tenders and deliver design and construct projects with our engineering partners. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.
Frequently asked questions
What is design and construct remedial work?
One contractor provides both the engineering design and the building work under a single contract.
Is an independent engineer better for strata?
For large or complex projects, an independent engineer gives owners independent advice, comparable tenders and supervision. For small repairs, design and construct can be quicker.
Can we use design and construct and still have independent oversight?
Yes. Many strata schemes use design and construct with their own engineer reviewing the design and inspecting key stages.