Remedial building for Strathfield homes and apartment buildings: cracked walls, underpinning, heritage repairs, balcony leaks and strata waterproofing.
Strathfield is known for its large Federation and inter-war homes on wide streets, along with walk-ups and high-rise apartment buildings closer to the station.
Big homes on clay soil with large trees can develop cracks and movement over time, and their roofs and verandahs are costly to neglect. Apartment buildings typically need work on balcony waterproofing, facades and basements.

Parts of Strathfield are heritage conservation areas, particularly among its large older homes, so changes may need council approval.
Leaking balconies cause concrete cancer, failed render lets water into walls. We fix the cause and the damage, so you deal with one licensed builder.
We work to your engineer's or consultant's specification, photograph every hold point and hand over the records your strata committee, insurer and future buyers will ask for. For Class 2 buildings we handle the DBP Act requirements with your design practitioner.
You deal directly with the builder, from the first inspection in Strathfield to the final flood test and handover.
Real reviews from strata buildings and homeowners.
I couldn't be more pleased that I found Constatine and his team to assist our strata building with landscaping, waterproofing, and concrete cancer repairs. He was knowledgeable, reliable, patient, and deeply committed to achieving the best result for everyone involved. I am 100% confident that the work completed will stand the test of time. He will absolutely be my go-to moving forward, and I have no doubt we will work together again.
Constatine and his team did an excellent job repairing and waterproofing our garage ceiling and walls, which had been affected by concrete cancer and sandstone erosion. Constatine is highly experienced in remedial works and provided clear advice, transparent costings, and recommended the best products available to ensure a long-lasting result. We highly recommend METCON for specialist remedial works.
My partner and I own an original 1920s semi-detached home in Vaucluse, with complex sandstone foundations and multiple structural challenges caused by previous defective works. After years of delays, failed consultants, and no progress, I met Constatine and his team. From the beginning, I was impressed by the detailed review of our plans and the identification of numerous discrepancies that previous builders had missed. The team supported us through lengthy council negotiations, neighbour consultations, and COVID-related delays, even before contracts were signed. Once construction commenced, Constatine and the Meteora Constructions team were exceptional. Progress remained on schedule despite heavy rain, unforeseen structural issues, and highly complex underpinning works that previous builders had refused to undertake. They completed the work efficiently and at significantly less cost than other builders had quoted. I cannot speak highly enough of Constatine and METCON Remedial Services. It is no understatement to say that engaging Constatine and his team saved not only our project, but probably our marriage as well.
Plain-language guides for owners and strata committees.
Straight answers from the builder. Anything else, just call.
Yes. We can prioritise anything that affects water or structure first, then stage the remaining repairs over time. A clear plan helps protect the home and spread out the cost.
Yes. We repair and re-waterproof balconies, terraces, podiums and wet areas on Strathfield apartment buildings and homes, and repair concrete cancer and balustrades at the same time where needed.
Yes. METCON is a licensed builder (384697C) and a registered building practitioner under the Design and Building Practitioners Act (BUP4254812), so we can carry out remedial work on Class 2 apartment buildings.
Many repairs are maintenance and do not, but some works can. Parts of Strathfield are heritage conservation areas, particularly among its large older homes, so changes may need council approval. The council is Strathfield Council. We check what applies before quoting.
It depends on what is under the tiles or render, access and the size of the job. We inspect, test where needed and give an itemised quote, with rates for anything hidden.
We work right across Inner West and the rest of Sydney. See all service areas.
Free inspection and a straight answer from a licensed, DBP registered Sydney builder.