Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Strata

Window Replacement in Strata Buildings (NSW)

18 November 2026 · 4 min read · By the METCON team

Many Sydney apartment buildings from the 1960s to 1990s still have their original aluminium or timber windows. Leaks, failed seals, rattling and corrosion are common. Replacing them is a significant strata project.

Who is responsible

In many strata plans, windows in external walls are common property, so the owners corporation is responsible for repair and replacement. Some plans and by-laws differ. Check your strata plan and get advice. See who is responsible.

Signs windows need replacing

  • Water entering around frames in heavy rain.
  • Corroded or warped frames.
  • Failed seals and gaskets.
  • Sashes that stick, drop or will not lock.
  • Repeated sealant repairs that keep failing. See window sealants.

Repair or replace

RepairReplace
Frames sound, seals failedFrames corroded or distorted
Leaks from sealant jointsLeaks through the frame itself
Isolated problemsProblems across the building

Approvals and regulated work

Windows are part of the building enclosure. On Class 2 buildings, replacing them is generally building work regulated under the Design and Building Practitioners Act, needing regulated designs and a registered builder. Council or heritage approvals may also apply, especially if the look of the building changes. See the DBP Act.

Standards that apply

Windows must suit the wind and water exposure of the building. In Australia, AS 2047 covers windows and external glazed doors, and AS 1288 covers glass selection. Higher floors and coastal buildings need higher ratings.

The flashing matters most

Many window leaks come from the junction between window and wall, not the window. New windows need proper sill flashings, head details and sealing to the wall, or they will leak like the old ones.

Running a whole-building program

  1. Survey every window and record its condition.
  2. Agree a standard design and get approvals.
  3. Stage the work floor by floor or elevation by elevation.
  4. Give residents notice and keep each unit weathertight every night.

Window and facade works

We replace windows and fix window leaks in apartment buildings as a DBP registered builder. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 apartment buildings. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Can an owner replace their own windows?

If windows are common property, an owner usually needs owners corporation approval, often through a by-law, and the work may be regulated.

How long does window replacement take per unit?

Often a day or two per unit for straightforward replacements, but it depends on the windows and the building.

Do new windows improve energy efficiency?

Better frames and glazing can reduce heat loss and gain, and noise. Choose glazing to suit the building and orientation.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote