Builder Licence 384697C DBP BUP4254812 Demolition AD214430
7 days, 7am to 7pm 0415 840 500
Remedial

Window Sealant Replacement on Apartment Buildings

9 November 2026 · 4 min read · By the METCON team

Sealant around windows and facade joints keeps water out while letting the building move. It has a limited life, and when it fails, water gets in around frames and into walls. Replacing it is often a quick, cost-effective repair.

Signs sealant has failed

  • Cracked, hard or shrunken sealant.
  • Sealant pulling away from frames or walls.
  • Gaps, missing sections or patchy repairs.
  • Stains, mould or swollen plaster around windows inside.
  • Leaks in wind-driven rain. See window wall leaks.
Staining around openings can point to failed sealants.
Staining around openings can point to failed sealants.

How long sealants last

It depends on the product, joint design and exposure. Sun-facing and weather-exposed elevations generally fail first. Regular inspection is the best guide.

Doing it properly

  1. Remove old sealant completely. New sealant over old rarely bonds well.
  2. Clean and prepare the joint surfaces.
  3. Prime where the manufacturer requires it.
  4. Install backing rod to the right depth.
  5. Use the right sealant for the materials and movement.
  6. Tool the joint for good shape and contact.
  7. Leave drainage holes clear, so window frames can still drain.

See failed sealants and joints.

Access

On taller buildings, rope access or a swing stage is often the most efficient way to reseal. See access options.

Combine with other works

If scaffold or access is going up for painting or concrete repairs, replace sealants at the same time. See repainting your strata building.

How it helps

New sealant stops leaks, protects frames and walls and reduces mould. It is often one of the best-value maintenance jobs on a building.

Sealant replacement

We replace window and facade sealants on apartment and commercial buildings. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

How do I know if window sealant needs replacing?

Look for cracked, hard or shrunken sealant, gaps or sealant pulling away, and leaks or stains around windows inside.

Can new sealant go over old sealant?

Generally no. Old sealant should be removed so the new sealant bonds properly.

How long does window sealant last?

It varies with product and exposure. Exposed, sun-facing elevations usually need attention first.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Structural Remediation
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote