Repainting Your Strata Building? Fix These Remedial Issues First

4 November 2026 · 4 min read · By the METCON team

Many strata schemes plan a repaint every 10 years or so. Scaffold goes up, the building gets a fresh look, and owners feel the levies were well spent. But if the painter paints over concrete cancer, cracks and failed sealants, those problems are back within a year or two, and the scaffold is gone.

Why a repaint is the right time for remedial work

  • Scaffold is already up. Access is often a large share of facade costs, and it is shared.
  • Every surface is inspected during preparation.
  • Paint lasts longer on a sound, dry substrate.
  • One disruption for residents instead of two.
Cracked render that should be repaired before repainting.
Cracked render that should be repaired before repainting.

Fix these before painting

Concrete cancer

Rust stains and cracks on slab edges, balconies, beams and columns. Painting over them traps moisture and hides the problem. See signs of concrete cancer.

Cracked and drummy render

Hollow or cracked render lets water in and eventually falls off. See cracked render repairs.

Cracks over windows

Often a sign of rusted steel lintels. Filling the crack will not stop it coming back.

Failed sealants

Window perimeters and expansion joints. See failed sealants.

Water through walls

If units get damp walls in storms, fix the cause before painting. See water through brick walls.

Balustrades

Corroded posts and fixings should be repaired before coating. See balustrade repairs.

How to plan it

  1. Get a facade inspection before the paint tender.
  2. Include remedial items in the scope, with unit rates for concrete and render repairs.
  3. Specify a coating system that suits the substrate, such as an anti-carbonation coating on concrete.
  4. Have the engineer or consultant inspect repairs before painting.

Repaint plus remedial, one contractor

We deliver facade remedial work and coordinate painting so the building is repaired, not just recoloured. METCON is a licensed builder (384697C) and DBP registered (BUP4254812) for Class 2 work. Call 0415 840 500 or book a free inspection.

Frequently asked questions

Can we just paint over cracks in our apartment building?

You can, but cracks caused by rusted lintels, concrete cancer or movement will come back through the paint. Fix the cause first.

Why combine remedial work with repainting?

Scaffold is already up, so access costs are shared, paint lasts longer on a sound surface, and residents only go through one disruption.

Do we need an engineer before repainting?

For older or coastal buildings with visible cracking or rust stains, a facade inspection before the paint tender is strongly recommended.

Written by the METCON teamMeteora Constructions Pty Ltd. Licensed NSW builder 384697C, DBP registered BUP4254812, 40+ years building across Sydney.
Related services

How we can help.

Everything in this article is work we do every week across Sydney.

Strata Remedial Works
Keep reading

More articles.

Practical guides from a licensed Sydney builder.

All articles

Got a project in mind?

Book a free site assessment. Straight answers on cost, scope and timeline.

Call now Free Quote