A lintel is the beam above a window or door that carries the brickwork over the opening. In many older Sydney homes and apartments, those lintels are steel angles that have been rusting quietly inside the wall for decades.
Signs of a failing lintel
- Cracks running up from the corners of windows and doors.
- Horizontal cracks along the mortar joint just above the opening.
- Rust stains bleeding through mortar or render above the opening.
- Bricks above the opening sagging or pushed out.
- Windows and doors starting to stick.

Why lintels rust
Water gets into the wall through failed flashings, cracked render or mortar, and sits on the steel. Rust takes up more space than steel, so the lintel expands and lifts and cracks the brickwork above. Coastal homes are especially affected.
How lintels are replaced
- Prop the brickwork above the opening with needles and props.
- Remove the bricks over the lintel and the corroded steel.
- Install a new lintel, galvanised or stainless, sized for the span and load.
- Install flashings and weep holes so water drains out of the wall.
- Rebuild the brickwork with matching bricks and mortar.
- Make good render, paint and window reveals.
Do not just fill the crack
Filling cracks over a rusting lintel hides the problem while the steel keeps expanding. Left long enough, brickwork above can become unsafe.
Bigger openings and beams
Large openings and structural beams follow the same principles with engineering. See replacing corroded steel beams.
Lintel replacement in Sydney
See our brickwork repair service or send us photos of the cracks above your windows.
Frequently asked questions
What causes cracks above windows in brick houses?
Very often a rusting steel lintel expanding and lifting the brickwork, or footing movement.
Can a rusted lintel be repaired instead of replaced?
Lightly rusted lintels can sometimes be treated, but expanded, delaminating lintels are usually replaced.
Do you need to remove the window to replace a lintel?
Not always. The brickwork above is propped and removed, and the window is protected, but it depends on the frame.